Art. 35 Regulation (EU) 2019/943

Establishment and mission of regional coordination centres

In forcesince 5 Jun 2019cited 19×
1.

By 5 July 2020, all transmission system operators of a system operation region shall submit a proposal for the establishment of regional coordination centres to the regulatory authorities concerned in accordance with the criteria set out in this Chapter.

The regulatory authorities of the system operation region shall review and approve the proposal.

The proposal shall at least include the following elements:

(a)

the Member State of the prospective seat of the regional coordination centres and the participating transmission system operators;

(b)

the organisational, financial and operational arrangements necessary to ensure the efficient, secure and reliable operation of the interconnected transmission system;

(c)

an implementation plan for the entry into operation of the regional coordination centres;

(d)

the statutes and rules of procedure of the regional coordination centres;

(e)

a description of cooperative processes in accordance with Article 38;

(f)

a description of the arrangements concerning the liability of the regional coordination centres in accordance with Article 47;

(g)

where two regional coordination centres are maintained on a rotational basis in accordance with Article 36(2), a description of the arrangements to provide clear responsibilities to those regional coordination centres and procedures on the execution of their tasks.

2.

Following approval by regulatory authorities of the proposal in paragraph 1, the regional coordination centres shall replace the regional security coordinators established pursuant to the system operation guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009 and shall enter into operation by 1 July 2022.

3.

Regional coordination centres shall have a legal form referred to in Annex II to Directive (EU) 2017/1132 of the European Parliament and of the Council [Directive (EU) 2017/1132 of the European Parliament and of the Council of 14 June 2017 relating to certain aspects of company law (OJ L 169, 30.6.2017, p. 46).].

4.

In performing their tasks under Union law, regional coordination centres shall act independently of individual national interests and independently of the interests of transmission system operators.

5.

Regional coordination centres shall complement the role of transmission system operators by performing the tasks of regional relevance assigned to them in accordance with Article 37. Transmission system operators shall be responsible for managing electricity flows and ensuring a secure, reliable and efficient electricity system in accordance with point (d) of Article 40(1) of Directive (EU) 2019/944.

The 10 that are cited most themselves, of 19.

  • Directive (EU) 2019/944262Law

    … означава регионален координационен център, създаден съгласно член 35 от Регламент (ЕС) 2019/943; 51) „напълно интегрирани мрежови …

  • Regulation (EU) 2019/94122Law

    … създадени регионални координационни центрове в съответствие с член 35 от Регламент (ЕС) 2019/943, под „региони“ се имат предвид …

  • Judgment of the General Court (Third Chamber, Extended Composition) of 25 September 2024. Bundesnetzagentur für Elektrizität, Gas, TelekommuDecision

    In addition, the effect of excluding non-critical network elements would be that the TSO that causes loop flows would not have an incentive to invest sufficiently in its network, since it would not bear the full cost of the remedial …

    25 Sep 2024 · 62021TJ0485

  • Decision_act (EU) 2024/560Law

    … 7 odst. 1, čl. 8 odst. 1 a 4, článků 9, 10, 11, článků 14 až 17, článků 19 až 27 a článků 35 až 47 nařízení (EU) 2019/943. V žádosti nebyla uvedena doba trvání požadované výjimky.

  • Energie-Control-Gesetz23aLaw

    … mit den Regulierungsbehörden der Netzbetriebsregionen zusammen, in denen ein regionales Koordinierungszentrum gemäß Art. 35 der Verordnung (EU) 2019/943 eingerichtet wurde, um in enger Abstimmung untereinander 1. den Vorschlag zur …

  • Elektrizitätswirtschaftsgesetz6Law

    … „regionales Koordinierungszentrum“ ein nach Art. 35 der Verordnung (EU) 2019/943 eingerichtetes regionales Koordinierungszentrum; 133. „Reservestrom“ den Strom, der über das Elektrizitätsnetz in den Fällen geliefert wird, in …

  • Regulation (EU) 2024/13662Law

    … регионални координационни центрове („РКЦ“), създадени съгласно член 35 от Регламент (ЕС) 2019/943; й) доставчици на управлявани услуги …

  • Code de l'énergiel134-3-1Law

    … pouvoirs supplémentaires éventuels à confier aux centres de coordination régionaux, établis en application de l'article 35 du règlement (UE) 2019/943 du Parlement européen et du Conseil du 5 juin 2019 sur le marché intérieur de …

  • Gesetz über die Elektrizitäts- und Gasversorgung59Law

    … November 2017, 23. Entscheidungen auf der Grundlage der Artikel 11, 13, 15, 16, 17 und 35 der Verordnung (EU) 2019/943 in der Fassung vom 13. Juni 2024, 24. die Überprüfung der Einhaltung der Vorgaben, die sich aus einer Verordnung …

  • Energiebesluit5.4Law

    … de ENTSB voor elektriciteit of de EU-DSB-entiteit; ii. de regionale coördinatiecentra, opgericht uit hoofde van artikel 35 van verordening 2019/943; d. brengt een certificeringsbeschikking voor een transmissiesysteembeheerder of een …