Furthermore TSIs should be reviewed in order to close the remaining open points. In particular, open points as regards specifications on the design of track to be compatible with the use of eddy current brake and the minimum factor for traffic codes should be closed in Commission Regulation (EU) No 1299/2014 [Commission Regulation (EU) No 1299/2014 of 18 November 2014 on the technical specifications for interoperability relating to the ‘infrastructure’ subsystem of the rail system in the European Union (OJ L 356, 12.12.2014, p. 1).]. Open points as regards specifications on aerodynamic effects, passive safety and variable gauge systems and braking systems should be closed in Commission Regulation (EU) No 1302/2014 [Commission Regulation (EU) No 1302/2014 of 18 November 2014 concerning a technical specification for interoperability relating to the ‘rolling stock — locomotives and passenger rolling stock’ subsystem of the rail system in the European Union (OJ L 356, 12.12.2014, p. 228).]. Open points as regards specifications on test conditions for on-track tests and variable gauge systems should be closed in Commission Regulation (EU) No 321/2013 [Commission Regulation (EU) No 321/2013 of 13 March 2013 concerning the technical specification relating to the subsystem ‘rolling stock — freight wagons’ of the rail system in the European Union and repealing Decision 2006/861/EC (OJ L 104, 12.4.2013, p. 1).].
Recital 5, Regulation (EU) 2019/776
In forcesince 16 May 2019
Commission Regulation (EU) No 321/2013 of 13 March 2013 concerning the technical specifi…Law
Commission Regulation (EU) No 1299/2014 of 18 November 2014 on the technical specificati…Law
Commission Regulation (EU) No 1302/2014 of 18 November 2014 concerning a technical speci…Law
- celex=32006D0861
- num:eu=2006/861