Even a successful certification process cannot always exclude that, when an on-board CCS subsystem interacts with a trackside CCS subsystem, one of the subsystems repeatedly fails to function or perform as intended under certain conditions. This may be due to variance in national control-command and signalling equipment (e.g. interlockings), engineering and operational rules, deficiencies in the specifications, different interpretations, design errors or equipment being installed incorrectly. Therefore, checks might need to be carried out to demonstrate the technical compatibility of the control-command and signalling subsystems in the area of use for a vehicle. The necessity of these checks should be considered as a temporary measure to increase the confidence on the technical compatibility between the subsystems. In addition, Regulation (EU) 2016/919 should specify the procedure for those checks. In particular, the principles applicable to those checks should be transparent and prepare the ground for further harmonisation. The possibility of executing those checks in a laboratory representing the trackside configuration to be made available by the Infrastructure Manager should be prioritised.
Recital 10, Regulation (EU) 2019/776
In forcesince 16 May 2019
- celex=32016R0919