The monitoring methodology plan should describe the instructions to the operator in a logical and simple manner, avoiding duplication of effort and taking into account the existing systems in place at the installation. The monitoring methodology plan should cover the monitoring of activity levels, energy flows and emissions at sub-installation level and serve as a basis for the baseline data reports as well as the annual activity level reporting required for the purpose of adjusting transitional free allocation in accordance with Article 10a(20) of Directive 2003/87/EC. Where possible, the operator should make use of synergies with the monitoring plan approved in accordance with Regulation (EU) No 601/2012.
Recital 11, Regulation (EU) 2019/331
In forcesince 19 Dec 2018
- celex=32012R0601