Art. 90 Regulation (EU) 2017/1485

Treatment of relevant assets located in a distribution system or in a closed distribution system

In forcesince 2 Aug 2017
1.

Each TSO shall coordinate with the DSO the outage planning of internal relevant assets connected to its distribution system.

2.

Each TSO shall coordinate with the CDSO the outage planning of internal relevant assets connected to its closed distribution system.