Art. 52 Regulation (EU) 2017/1485

Data exchange between TSOs and transmission-connected demand facilities

In forcesince 2 Aug 2017
1.

Unless otherwise provided by the TSO, each transmission-connected demand facility owner shall provide the following structural data to the TSO:

(a)

electrical data of the transformers connected to the transmission system;

(b)

characteristics of the load of the demand facility; and

(c)

characteristics of the reactive power control.

2.

Unless otherwise provided by the TSO, each transmission-connected demand facility owner shall provide the following data to the TSO:

(a)

scheduled active and forecasted reactive power consumption on a day-ahead and intraday basis, including any changes of those schedules or forecast;

(b)

any forecasted restriction in the reactive power control capability;

(c)

in case of participation in demand response, a schedule of its structural minimum and maximum power range to be curtailed; and

(d)

by exception to point (a), in regions with a central dispatch system, the data requested by the TSO for the preparation of its active power output schedule.

3.

Unless otherwise provided by the TSO, each transmission-connected demand facility owner shall provide the following data to the TSO in real-time:

(a)

active and reactive power at the connection point; and

(b)

the minimum and maximum power range to be curtailed.

4.

Each transmission-connected demand facility owner shall describe to its TSO its behaviour at the voltage ranges referred to in Article 27.