All TSOs of each synchronous area with more than one LFC area shall specify in the synchronous area operational agreement a common ramping period of aggregated netted schedules between the LFC areas in the synchronous area. The calculation of the control program from the netted area AC position for ACE calculation shall be performed with the common ramping period.
Art. 136 Regulation (EU) 2017/1485
Ramping period within the synchronous area
In forcesince 2 Aug 2017cited 1×
Regulation (EU) 2017/219550Law
… по член 142 от Регламент (ЕС) 2017/1485; б) срока за линейно изменение по член 136 от Регламент (ЕС) 2017/1485. 4. В срок от осемнадесет месеца от …