1.
The ENTSO for Electricity operational planning data environment shall contain a module for the storage and exchange of all relevant information for performing a coordinated adequacy analysis.
2.
The information referred to in paragraph 1 shall include at least:
(a)
the season-ahead system adequacy data provided by each TSO;
(b)
the season-ahead pan-European system adequacy analysis report;
(c)
forecasts used for adequacy in line with Article 104; and
(d)
information about a lack of adequacy in line with Article 105(4).