Art. 72 Regulation (EU) 2017/746

Corrective measures to be taken by Member States and information exchange between Member States on performance studies

In forcecited 4×
1.

Where a Member State in which a performance study is being or is to be conducted has grounds for considering that the requirements set out in this Regulation are not met, it may take at least any of the following measures on its territory:

(a)

revoke the authorisation for the performance study;

(b)

suspend or terminate the performance study;

(c)

require the sponsor to modify any aspect of the performance study.

2.

Before the Member State concerned takes any of the measures referred to in paragraph 1 it shall, except where immediate action is required, ask the sponsor or the investigator or both for their opinion. That opinion shall be delivered within seven days.

3.

Where a Member State has taken a measure referred to in paragraph 1 of this Article, or has refused a performance study, or has been notified by the sponsor of the early termination of a performance study on safety grounds, that Member State shall communicate the corresponding decision and the grounds therefor to all Member States and the Commission by means of the electronic system referred to in Article 69.

4.

Where an application is withdrawn by the sponsor prior to a decision by a Member State, that information shall be made available through the electronic system referred to in Article 69 to all Member States and the Commission.

  • Code de la santé publiquer1126-19r1126-31Law

    … performances prise par l'Agence nationale de sécurité du médicament et des produits de santé, en application de l'article 72 du règlement (UE) 2017/746 précité.

  • MPDG4468Law

    … veranlassen sind. (2) Die zuständige Bundesoberbehörde ergreift die in Artikel 76 der Verordnung (EU) 2017/745 oder Artikel 72 der Verordnung (EU) 2017/746 genannten Korrekturmaßnahmen nach Maßgabe von § 45.

  • Medizinproduktegesetz 202131Law

    … 76 der Verordnung (EU) Nr. 745/2017 oder des Art. 72 der Verordnung (EU) Nr. 746/2017 auch ohne vorangegangenes Verfahren oder vor Erlassen eines Bescheides treffen; hierüber ist jedoch innerhalb von zwei Wochen ein schriftlicher Bescheid …

  • MPDG4468Law