2 ‘Appendix 9, Regulation (EU) 2016/1718

In forcesince 20 Sep 2016

Section 3 of the EC type-approval number issued according to Articles 6(1), 8(1) and 10(1) shall be composed by the number of the implementing regulatory act or the latest amending regulatory act applicable to the EC type-approval. The number shall be followed by an alphabetical character reflecting the requirements of OBD and SCR systems in accordance with Table 1.

[“NOx OTL” monitoring requirements as set out in Table 1 of Annex X for compression ignition and dual-fuel engines and vehicles and Table 2 of Annex X for positive ignition engines and vehicles.] [“PM OTL” monitoring requirements as set out in Table 1 of Annex X for compression ignition and dual-fuel engines and vehicles.] [“Performance monitoring” requirements as set out in point 2.1.1 of Annex X.] [Reagent quality “phase-in” requirements as set out in point 7.1 of Annex XIII.] [Reagent quality “general” requirements as set out in point 7.1.1 of Annex XIII.] [“CO OTL” monitoring requirements as set out in Table 2 of Annex X for positive ignition engines and vehicles.] [IUPR “Phase-in” requirements as set out in Section 6 of Annex X.] [IUPR “General” requirements as set out in Section 6 of Annex X.] [For positive-ignition engines and vehicles equipped with such engines.] [For compression-ignition and dual-fuel engines and vehicles equipped with such engines.] [Only applicable to positive-ignition engines and vehicles equipped with such engines.] [Additional provisions concerning monitoring requirements as set out in paragraph 2.3.1.2 of Annex 9A to UNECE Regulation No 49.] [IUPR specifications are set out in Annex X. Positive Ignition engines and vehicles equipped with such engines are not subjected to IUPR.] [ISC requirement set out in Appendix 1 to Annex II.]

N/A Not applicable.’.

Character | NOx OTL | PM OTL | CO OTL | IUPR | Reagent quality | Additional OBD monitors | Power threshold requirements | Implementation dates: new types | Implementation dates: all vehicles | Last date of registration

A

B

Row “phase-in period” of Tables 1 or Table 2 | Performance. Monitoring | N/A | Phase-in | Phase-in | N/A | 20 % | 31.12.2012 | 31.12.2013 |

31.8.2015

30.12.2016

B | Row “phase-in period” of Tables 1 and 2 | N/A | Row “phase-in period” of Table 2 | N/A | Phase-in | N/A | 20 % | 1.9.2014 | 1.9.2015 | 30.12.2016

C | Row “general requirements” of Tables 1 or Table 2 | Row “general requirements” of Table 1 | Row “general requirements” of Table 2 | General | General | Yes | 20 % | 31.12.2015 | 31.12.2016 | 31.12.2018

D | Row “general requirements” of Tables 1 or Table 2 | Row “general requirements” of Table 1 | Row “general requirements” of Table 2 | General | General | Yes | 10 % | 1.9.2018 | 1.9.2019 |