Art. 5 Regulation (EU) 2016/631

Determination of significance

In forcesince 14 Apr 2016cited 16×
1.

The power-generating modules shall comply with the requirements on the basis of the voltage level of their connection point and their maximum capacity according to the categories set out in paragraph 2.

2.

Power-generating modules within the following categories shall be considered as significant:

(a)

connection point below 110 kV and maximum capacity of 0,8 kW or more (type A);

(b)

connection point below 110 kV and maximum capacity at or above a threshold proposed by each relevant TSO in accordance with the procedure laid out in paragraph 3 (type B). This threshold shall not be above the limits for type B power-generating modules contained in Table 1;

(c)

connection point below 110 kV and maximum capacity at or above a threshold specified by each relevant TSO in accordance with paragraph 3 (type C). This threshold shall not be above the limits for type C power-generating modules contained in Table 1; or

(d)

connection point at 110 kV or above (type D). A power-generating module is also of type D if its connection point is below 110 kV and its maximum capacity is at or above a threshold specified in accordance with paragraph 3. This threshold shall not be above the limit for type D power-generating modules contained in Table 1.

Table 1

Limits for thresholds for type B, C and D power-generating modules

Synchronous areas | Limit for maximum capacity threshold from which a power-generating module is of type B | Limit for maximum capacity threshold from which a power-generating module is of type C | Limit for maximum capacity threshold from which a power-generating module is of type D

Continental Europe | 1 MW | 50 MW | 75 MW

Great Britain | 1 MW | 50 MW | 75 MW

Nordic | 1,5 MW | 10 MW | 30 MW

Ireland and Northern Ireland | 0,1 MW | 5 MW | 10 MW

Baltic | 0,5 MW | 10 MW | 15 MW

3.

Proposals for maximum capacity thresholds for types B, C and D power-generating modules shall be subject to approval by the relevant regulatory authority or, where applicable, the Member State. In forming proposals the relevant TSO shall coordinate with adjacent TSOs and DSOs and shall conduct a public consultation in accordance with Article 10. A proposal by the relevant TSO to change the thresholds shall not be made sooner than three years after the previous proposal.

4.

Power-generating facility owners shall assist this process and provide data as requested by the relevant TSO.

5.

If, as a result of modification of the thresholds, a power-generating module qualifies under a different type, the procedure laid down in Article 4(3) concerning existing power-generating modules shall apply before compliance with the requirements for the new type is required.

The 10 that are cited most themselves, of 16.

  • Regulation (EU) 2017/14851542Law

    … за производство на електроенергия от тип С и тип D, определени в член 5 от Регламент (ЕС) 2016/631, действащи като предоставящи РПРЧ …

  • Regulation (EU) 2016/144738Law

    … Категоризацията в член 5 от Регламент (ЕС) 2016/631 се прилага за модули от вида „електроенергиен парк“, присъединени чрез връзка за …

  • Regulation (EU) 2017/21962Law

    … като тип C и D в съответствие с критериите, формулирани в член 5 от Регламент (ЕС) 2016/631 [Регламент (ЕС) 2016/631 на Комисията от 14 април 2016 …

  • Netcode elektriciteit13.214.114.214.3Law

    … op een aangeslotene die beschikt over een elektriciteitsproductie-eenheid die overeenkomstig de criteria van artikel 5 van Verordening (EU) 2016/631 als type B, C of D zou worden geclassificeerd maar waarop overeenkomstig artikel 4, eerste …

  • Verordnung zur Bestimmung kritischer Anlagen nach dem BSI-GesetzLaw

    … Der Schwellenwert von 36 MW für zur Erbringung von Primärregelleistung präqualifizierter Anlagen ergibt sich aus Artikel 5 Absatz 3 der Verordnung (EU) 2016/631 der Kommission vom 14. April 2016 zur Festlegung eines Netzkodex mit …

  • Systeemcode elektriciteit 202612.213.113.213.3Law

    … op een aangeslotene die beschikt over een elektriciteitsproductie-eenheid die overeenkomstig de criteria van artikel 5 van Verordening (EU) 2016/631 als type B, C of D zou worden geclassificeerd maar waarop overeenkomstig artikel 4, eerste …

  • RfG Schwellenwert-Verordnung2Law

    § 2. Die Schwellenwerte für die Maximalkapazität von Stromerzeugungsanlagen des Typs B, C und D im Sinne des Art. 5 Abs. 2 der Verordnung (EU) 2016/631 werden wie folgt festgesetzt: Schwellenwert der Maximalkapazität von …

  • Verordnung zum Nachweis von elektrotechnischen Eigenschaften von Energieanlagen7Law

    … Kraft getreten sind. (3) Bis zur Genehmigung der Schwellenwerte für die Maximalkapazität von Erzeugungsanlagen nach Artikel 5 Absatz 3 der Verordnung (EU) 2016/631 durch die Bundesnetzagentur ist § 2 Absatz 2 und 3 mit der Maßgabe …

  • RfG Anforderungs-Verordnung2Law

    § 2. Diese Verordnung gilt für neue Stromerzeugungsanlagen im Sinne der Art. 3 und 4 der Verordnung (EU) 2016/631 des Typs A, B, C und D, die gemäß Art. 5 Abs. 2 der Verordnung (EU) 2016/631 als signifikant gelten.

  • Commission Regulation (EU) 2017/2196 of 24 November 2017 establishing a network code on…2Law

    … (b) existing and new power generating modules classified as type B in accordance with the criteria set out in Article 5 of Regulation (EU) 2016/631, where they are identified as SGUs in accordance with Article 11(4) and Article 23(4); (c) …