Project title | <type='S' maxlength=255 input='M'>
CCI | <type='S' maxlength=15 input='S'>
[Legend for the characteristics of fields: type: N = Number, D = Date, S = String, C = Checkbox, P = Percentage input: M = Manual, S = Selection, G = Generated by system maxlength = Maximum number of characters including spaces]
A.1.1 | Name: | <type='S' maxlength='200' input='M'>
A.1.2 | Address: | <type='S' maxlength='400' input='M'>
A.1.3 | Name of contact person | <type='S' maxlength='200' input='M'>
A.1.4 | Position of contact person | <type='S' maxlength='200' input='M'>
A.1.5 | Telephone: | <type='N' input='M'>
A.1.6 | E-mail: | <type='S' maxlength='100' input='M'>
A.2.1 | Name: | <type='S' maxlength='200' input='M'>
A.2.2 | Address: | <type='S' maxlength='400' input='M'>
A.2.3 | Name of contact person | <type='S' maxlength='200' input='M'>
A.2.4 | Position of contact person | <type='S' maxlength='200' input='M'>
A.2.5 | Telephone: | <type='N' input='M'>
A.2.6 | E-mail: | <type='S' maxlength='100' input='M'>
< type='S' maxlength='200' input='M'>
Yes | □ | No | □
A.3.3.1 Value in million EUR <type='N' input='M'>
A.3.3.2 Year <type='N' input='M'>
A.3.4.1 Number of persons employed <type='N' input='M'>
A.3.4.2 Year <type='N' input='M'>
Are 25 % or more of the capital or voting rights of the undertaking owned by one enterprise or a group of enterprises falling outside the definition of an SME? <type='C' input='M'>
Yes | □ | No | □
Indicate the name and describe the group structure
< type='S' maxlength='1750' input='M'>
A.4.1
Technical capacity (at minimum please give overview of expertise required for project implementation and indicate the number of staff with such expertise available within the organisation and allocated to the project)
< type='S' maxlength='1750' input='M'>
A.4.2
Legal capacity (as minimum information, indicate the legal status of the beneficiary allowing to implement the project, and its capacity to undertake legal action, if necessary).
< type='S' maxlength='1750' input='M'>
A.4.3
Financial capacity (at minimum please confirm financial standing of the body responsible for project implementation to demonstrate that it is able to guarantee the liquidity for adequate funding to the project to ensure its successful implementation and future operation in addition to the other activities of the body)
< type='S' maxlength='1750' input='M'>
A.4.4
Administrative capacity (as minimum information, please, indicate the EU-funded and/or comparable projects carried out in the last ten years and, in absence of such examples, indicate if technical assistance needs have been considered; please refer to institutional arrangements such as the existence of Project Implementation Unit (PIU) capable to implement and operate the project and, if possible, include the proposed organisational chart for project implementation and operation).
< type='S' maxlength='1750' input='M'>
< type='S' maxlength='1750' input='M'>
A.5.1
Give details of how the infrastructure will be managed after the project is completed (i.e. name of the operator; selection methods — public management or concession; type of contract, etc.).
< type='S' maxlength='1750' input='M'>
CCI of OP | Priority axis of OP
OP1<type='S' input='S'> | Priority axis of OP 1<type='S' input='S'>
OP1<type='S' input='S'> | Priority axis of OP 1<type='S' input='S'>
OP2<type='S' input='S'> | Priority axis of OP 2<type='S' input='S'>
OP2<type='S' input='S'> | Priority axis of OP 2<type='S' input='S'>
B.1.1
Is the project contained in the list of major projects in the operational programme(s)? [As required by Article 102(5) of Regulation (EU) No 1303/2013.] <type='C' input='M'>
Yes | □ | No | □
[NACE-Rev.2, 4 digit code: Regulation (EC) No 1893/2006 of the European Parliament and of the Council (OJ L 393, 30.12.2006, p. 1).] [Regulation (EC) No 1059/2003 of the European Parliament and of the Council (OJ L 154, 21.6.2003, p. 1) as amended. Use the most detailed and relevant NUTS III code. Where a project affects multiple individual NUTS III level areas, consider encoding the NUTS III or higher codes.] [New construction = 1; extension = 2; conversion/modernisation = 3; change of locality = 4; creation by take over = 5.] [Combined Nomenclature (CN), Council Regulation (EEC) No 2658/87 (OJ L 256, 7.9.1987, p. 1).]
Code | Amount | Percentage
B.2.1. Code(s) for the intervention field dimension(s)
(More than one should be used where, based on a pro rata calculation, several intervention fields are relevant)
<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>
<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>
<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>
<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>
<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>
B.2.2. Code for the form of finance dimension
(More than one may be relevant in some cases — pro rata shares to be provided)
<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>
<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>
B.2.3. Code for the territorial dimension
(More than one may be relevant in some cases — pro rata shares to be provided)
<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>
<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>
B.2.4. Code for the territorial delivery mechanism
<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>
B.2.5. Code for the thematic objective dimension
(More than one may be relevant in some cases — pro rata shares to be provided)
<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>
B.2.6. Code for the economic dimension (NACE Code)
(More than one may be relevant in some cases — pro rata shares to be provided)
<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>
<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>
B.2.7. Code for the location dimension (s) (NUTS III)
(More than one may be relevant in some cases — pro rata shares to be provided)
<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>
<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>
B.2.8. Nature of the investment (to be filled in for productive investments only)
<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>
B.2.9. Product concerned (to be filled in for productive investments only)
<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>
B.3.1
Please provide a concise (max. 2 pages) description of the project (presenting its aim, existing situation, issues it will address, facilities to be constructed, etc.), a map identifying the project area [In the case of a PPP where the private partner has not yet been selected and is responsible for securing the location, the applicant does not need to provide the map identifying the project area.], geo-referenced data [Please provide in Appendix 5 geo-referenced data in vector format, containing polygons, lines and/or points as appropriate, to represent the project in preferably shape file format.] and the main project components with their individual total cost estimates (without activity cost breakdown).
In case of productive investments a detailed technical description must also be provided including: the work involved specifying its main characteristics, the establishment, main activities and main elements of the financial structure of the enterprise, main aspects of the investment, the description of the production technology and equipment and the description of the products.
< type='S' maxlength='7000' input='M'>
B.3.2
Is this project a phase of a major project [A major project started in the 2007-2013 programming period of which one or more phases have been completed in that programing period, and this project represents a phase which will be carried out and completed in the 2014-2020 programming period, or a project started in the 2014-2020 programming period of which this project represents a phase which will be completed, while the next phase will be completed in this or the subsequent programming period.]? <type='C' input='M'>
Yes | □ | No | □
B.3.3
If the project is a phase of an overall project, provide a concise description of the proposed phases of implementation and explain how they are technically and financially independent. Explain what criteria have been used to determine the division of the project into phases. Please provide a share (percentage) of the overall project which this phase covers. If the project is co-financed by more than one Operational Programme, indicate which parts fall under which Operational Programme and their pro-rata allocation.
< type='S' maxlength='3500' input='M'>
B.3.4
Have the Commission previously approved any part of this major project? <type='C' input=M>
Yes | □ | No | □
If yes, please provide the CCI number of the major project approved.
< type='S' input='S'>
If this project is a part of the major project phased for which the first phase was carried in the 2007-2013, please provide a description of the physical and financial objectives of the previous phase, including a description of the implementation of the first phase and confirm that it is or will be ready to be used for its purpose.
< type='S' maxlength='10500' input='M'>
B.3.5
Does the project form part of a Trans-European Network agreed at Union level? <type='C' input='M'>
Yes | □ | No | □
If yes, please give details and give reference to the relevant EU legislation [For energy: is the project defined as project of common interest under Regulation No 347/2013 on Guidelines for trans-European energy infrastructure and repealing Decision No 1364/2006/EC and amending Regulations (EC) No 713/2009, (EC) No 714/2009 and (EC) No 715/2009? For transport: is the project covered under Regulation (EU) No 1315/2013 on Union guidelines for the development of the trans-European transport network and repealing Decision No 661/2010/EU?].
< type='S' maxlength='1750' input='M'>
covered under Article 3(1)(a) of Regulation (EU) No 1301/2013 of the European Parliament and of the Council [Regulation (EU) No 1301/2013 of the European Parliament and of the Council 17 December 2013 on the European Regional Development Fund and on specific provisions concerning the Investment for growth and jobs goal and repealing Regulation (EC) No 1080/2006 (OJ L 347, 20.12.2013, p. 289).]? <type='C' input='M'>
Yes | □ | No | □
If yes, please, explain how it contributes to creating and safeguarding jobs (notably for young people)
< type='S' maxlength='1750' input='M'>
covered under Article 3(1)(b) of Regulation (EU) No 1301/2013? <type='C' input='M'>
Yes | □ | No | □
If yes, please, explain how it contributes to the investment priorities set out in Article 5(1) and (4) Regulation (EU) No 1301/2013, and, if that investment involves cooperation between large enterprises and SMEs, how it contributes to investment priorities in Article 5(2) of that Regulation.
< type='S' maxlength='1750' input='M'>
B.4.
Project objectives and its consistency with the relevant priority axes of the operational programme or operational programmes concerned, and its expected contribution to achieving the specific objectives and results of those priority axes and the expected contribution to socio-economic development of the area covered by the operational programme.
B.4.1
What are the main project objectives? Please list them here and give short explanation
< type='S' maxlength='1750' input='M'>
B.4.2
Please give details on the project's consistency with the relevant priority axes of the operational programme or operational programmes and its expected contribution to achieving the result indicators under the specific objectives of those priority axes
< type='S' maxlength='1750' input='M'>
B.4.3
Please explain how the project will contribute to socio-economic development of the area covered by the operational programme
< type='S' maxlength='1750' input='M'>
B.4.4
Please explain what measures have been planned/taken by the beneficiary to ensure optimal utilisation of the infrastructure in the operation phase
< type='S' maxlength='1750' input='M'>
Ineligible costs comprise (i) expenditure outside the eligibility period, (ii) expenditure ineligible under applicable EU and national rules, (iii) other expenditure not presented for co-financing. NB: The starting date for eligibility of expenditure is the date of submission of the operational programme to the Commission or 1 January 2014, whichever is the earlier [Unless project specific rules must apply e.g. state aid.].
Contingencies should not exceed 10 % of total cost net of contingencies. These contingencies may be included in the total eligible costs used to calculate the planned contribution of the funds.
A price adjustment may be included, where relevant, to cover expected inflation where the eligible cost values are in constant prices.
Recoverable VAT is ineligible. Where VAT is considered eligible, please give reasons.
Total cost must include all costs incurred for the project, from planning to supervision and must include VAT regardless of whether it is recoverable or not.
The purchase of land not built on and land built on in the amount exceeding 10 % of the total eligible expenditure for the operation concerned in accordance with Article 69(3)(b) of Regulation (EU) No 1303/2013. In exceptional and duly justified cases, a higher percentage may be permitted for operations concerning environmental conservation.
Total eligible cost before taking into account of the requirements set out in Article 61 of Regulation (EU) No 1303/2013.
EUR |
Total cost
(A)
Ineligible costs (1)
(B)
Eligible costs
(C) = (A) – (B)
Percentage of total eligible costs
Input | Input | Calculated | Calculated
1 | Planning/design fees | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='G'> | <type='P' input='G'>
2 | Land purchase | <type='N' input='M'> | <type='N' input='M'> (6) | <type='N' input='G'> | <type='P' input='G'>
3 | Building and construction | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='G'> | <type='P' input='G'>
4 | Plant and machinery or equipment | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='G'> | <type='P' input='G'>
5 | Contingencies (2) | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='G'> | <type='P' input='G'>
6 | Price adjustment (if applicable) (3) | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='G'> | <type='P' input='G'>
7 | Publicity | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='G'> | <type='P' input='G'>
8 | Supervision during construction implementation | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='G'> | <type='P' input='G'>
9 | Technical assistance | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='G'> | <type='P' input='G'>
10 | Sub-TOTAL | <type='N' input='G'> | <type='N' input='G'> | <type='N' input='G'> | <type='P' input='G'>
11 | (VAT (4)) | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='G'> | <type='P' input='G'>
12 | TOTAL | <type='N' input='G'> (5) | <type='N' input='G'> | <type='N' input='G'> (7) | <type='P' input='G'>
Please provide the exchange rate and the reference (where applicable)
< type='S' maxlength='875' input='M'>
If you have any comments regarding any of the items above (e.g. no contingencies envisaged, eligible VAT), please note them below.
< type='S' maxlength='1750' input='M'>
Do you consider that this project involves the granting of State aid? <type='C' input='M'>
Yes | □ | No | □
If yes, please fill in the table below [The Commission services provided guidance to Member States to facilitate the assessment when infrastructure investments involve State aid. In particular, the Commission services have prepared analytical grids. Commission Notice on the notion of State aid as referred to in Article 107(1) of the Treaty on the Functioning of the European Union has been published (C/2016/2946) (OJ C 262, 19.7.2016, p. 1). The Commission invites Member States to make use of the analytical grids or of other methods for explaining why it is considered that the support does not involve the granting of State aid.]:
[Gross grant equivalent (GGE) means the discounted value of the aid expressed as a percentage of the discounted value of the eligible costs, as calculated at the time of award of the aid on the basis of the reference rate applicable on that date.] [State aid rules include provisions on eligible cost. In this column Member States should indicate the total amount of eligible cost based on the State aid rules that have been applied.] [Commission Decision 2012/21/EU of 20 December 2011 on the application of Article 106(2) of the Treaty on the Functioning of the European Union to State aid in the form of public service compensation granted to certain undertakings entrusted with the operation of services of general economic interest (OJ L 7, 11.1.2012, p. 3).] [Regulation (EC) No 1370/2007 of the European Parliament and of the Council of 23 October 2007 on public passenger transport services by rail and by road and repealing Council Regulations (EEC) 1191/69 and 1107/70 (OJ L 315, 3.12.2007, p. 1).]
Amount of aid (EUR) in GGE | Total amount of eligible cost (EUR) |
Aid intensity
(in %)
State aid number/registry number for block-exempted aid
Approved aid scheme or approved individual aid | <type='N' input='M'> | <type='N' input='M'> | <type='P' input='M'> | <type='N' input='M'>
Aid falling under a block exemption regulation | <type='N' input='M'> | <type='N' input='M'> | <type='P' input='M'> | <type='N' input='M'>
Aid in line with the SGEI decision or the regulation on public land passenger traffic | <type='N' input='M'> | <type='N' input='M'> | <type='P' input='M'> | <type='N' input='M'>
Total aid granted | <type='N' input='G'> | Not applicable | Not applicable | Not applicable
If no, please explain in detail the basis for establishing that the project does not involve state aid [The Commission services provided guidance to Member States to facilitate the assessment when infrastructure investments involve State aid. In particular, the Commission services have prepared analytical grids. A Communication on the notion of aid is currently in preparation. The Commission invites Member States to make use of the analytical grids or of other methods for explaining why it is considered that the support does not involve the granting of State aid.]. Please provide this information for all groups of potential State aid recipients, for example, in case of infrastructures, for the owner, the constructors, the operator and for the users of an infrastructure. If applicable, please indicate whether the reason why you consider that the project does not involve State aid is that (i) the project does not concern any economic activity (including activities in the public remit) or that (ii) the recipient(s) of support enjoy a legal monopoly for the relevant activities and are not active in any other liberalised sector (or will keep separate accounts in case the recipient(s) are active in additional sectors).
< type='S' maxlength='3500' input='M'>
The total eligible cost amount after taking into account of the requirements set out in Article 61 of Regulation (EU) No 1303/2013 should be used to verify if the project has reached the threshold of a major project in accordance with Article 100 of Regulation (EU) No 1303/2013.
Please choose the relevant option and complete the information as required. For non-revenue-generating operations please choose the method in Article 61(3) (b) of Regulation (EU) No 1303/2013 and set pro-rata application of discounted net revenue at 100 %.
[As required by Article 61 of Regulation (EU) No 1303/2013.]
Method of calculation of the potential net revenue | Method used as chosen by the managing authority for the relevant sector, sub-sector or type of operation (Check one box only)
Calculation of the discounted net revenue | <type='C' input='M'>
Flat rate method | <type='C' input='M'>
Decreased co-financing rate method | <type='C' input='M'>
Calculation of the discounted net revenue (Article 61(3)(b) of Regulation (EU) No 1303/2013):
Value
|
Total eligible cost before taking into account of the requirements set out in Article 61 of Regulation (EU) No 1303/2013 (in EUR, not discounted)
(Section C.1.12(C))
<type='N' input='G'>
| Pro-rata application of discounted net revenue (%) (if applicable) = (E.1.2.9) | <type='N' input='M'>
|
Total eligible cost after taking into account of the requirements set out in Article 61 of Regulation (EU) No 1303/2013 (in EUR, not discounted) = (1) * (2)
The maximum public contribution must respect the State aid rules and the amount of total aid granted reported above (if applicable)
<type='N' input='M'>
Flat rate method or decreased co-financing rate method (Article 61(3)(a), Article 61(3)(aa) and Article 61(5) of Regulation (EU) No 1303/2013)
[In case of decreased co-financing rate method, this formula is not applicable (flat rate is reflected in the co-financing rate of the priority axis, resulting in lower ERDF/CF financing) and the total eligible cost is equal to the amount mentioned in point 1.]
Value
|
Total eligible cost before taking into account the requirements set out in Article 61 of Regulation (EU) No 1303/2013 (in EUR, not discounted)
(Section C.1.12(C))
<type=’N’ input=’G’>
| Net revenue flat rate as defined in Annex V to Regulation (EU) No 1303/2013 or delegated acts or established on the basis of Article 61(3)(aa) (FR) (%) | <type=’N’ input=’M’>
|
Total eligible cost after taking into account the requirements set out in Article 61 of Regulation (EU) No 1303/2013 (in EUR, not discounted) = (1) × (1 – FR)
The maximum public contribution must respect the State aid rules and the amount of total aid granted reported above (if applicable)
<type=’N’ input=’M’>
Please provide a summary of the demand analysis, including the predicted demand growth rate, in order to demonstrate the demand for the project, in accordance with the approach as set out in Annex III (Methodology for carrying out the cost-benefit analysis) to this Regulation. At the minimum the following information should be included:
methodology for projections;