ANNEX I Format for the notification of a selected major project, Commission Implementing Regulation (EU) No 1011/2014 of 22 September 2014 laying down de…

In forcesince 22 Feb 2019

[Legend for the characteristics of fields: type: N = Number, D = Date, S = String, C = Checkbox, P = Percentage input: M = Manual, S = Selection, G = Generated by system maxlength = Maximum number of characters including spaces]

A.1.1 | Name: | <type='S' maxlength='200' input='M'>

A.1.2 | Address: | <type='S' maxlength='400' input='M'>

A.1.3 | Name of contact person | <type='S' maxlength='200' input='M'>

A.1.4 | Position of contact person | <type='S' maxlength='200' input='M'>

A.1.5 | Telephone: | <type='N' input='M'>

A.1.6 | E-mail: | <type='S' maxlength='100' input='M'>

A.2.1 | Name: | <type='S' maxlength='200' input='M'>

A.2.2 | Address: | <type='S' maxlength='400' input='M'>

A.2.3 | Name of contact person | <type='S' maxlength='200' input='M'>

A.2.4 | Position of contact person | <type='S' maxlength='200' input='M'>

A.2.5 | Telephone: | <type='N' input='M'>

A.2.6 | E-mail: | <type='S' maxlength='100' input='M'>

Yes | □ | No | □

If yes, please provide a description of the physical and financial objectives of the overall project.

<type='S' maxlength='3500' input='M'>

Yes | □ | No | □

If yes, please provide the CCI of the major project approved.

<type='S' input='M'>

If this project is a part of the major project for which the first phase was carried out in the 2007-2013, please provide a detailed description of the physical and financial objectives of the previous phase, including a description of the implementation of the first phase and confirm that it is or will be ready to be used for its purpose.

<type='S' maxlength='3500' input='M'>

[Projects falling under Article 103 of Regulation (EU) No 1303/2013 do not require submission of the independent quality review report.]

Yes | □ | No | □

[NACE-Rev.2, 4 digit code: Regulation (EC) No 1893/2006 of the European Parliament and of the Council (OJ L 393, 30.12.2006, p. 1).] [Regulation (EC) No 1059/2003 of the European Parliament and of the Council (OJ L 154, 21.6.2003, p. 1) as amended. Use the most detailed and relevant NUTS III code. Where a project affects multiple individual NUTS III level areas, consider encoding the NUTS III or higher codes.] [New construction = 1; extension = 2; conversion/modernisation = 3; change of locality = 4; creation by take over = 5.] [Combined Nomenclature (CN), Council Regulation (EEC) No 2658/87 (OJ L 256, 7.9.1987, p. 1).]

Code | Amount | Percentage

B.2.1. Code(s) for the intervention field dimension(s)

(More than one should be used where, based on a pro rata calculation, several intervention fields are relevant)

<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>

<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>

<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>

<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>

<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>

B.2.2. Code for the form of finance dimension

(More than one may be relevant in some cases — pro rata shares to be provided)

<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>

<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>

B.2.3. Code for the territorial dimension

(More than one may be relevant in some cases — pro rata shares to be provided)

<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>

<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>

B.2.4. Code for the territorial delivery mechanism

<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>

B.2.5. Code for the thematic objective dimension

(More than one may be relevant in some cases — pro rata shares to be provided)

<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>

<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>

B.2.6. Code for the economic dimension (NACE Code)

(More than one may be relevant in some cases — pro rata shares to be provided)

<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>

<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>

B.2.7. Code for the location dimension(s) (NUTS III)

(More than one may be relevant in some cases — pro rata shares to be provided)

<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>

<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>

B.2.8. Nature of the investment (to be filled in for productive investments only)

<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>

B.2.9. Product concerned (to be filled in for productive investments only)

<type='N' input='S'> | <type='N' input='M'> | <type='P' input='G'>

B.2.1

Identification of the operational programme or operational programmes and priority axis or priority axes:

CCI of OP | Priority axis of OP | Co-financing Fund

OP1<type='S' input='S'> | Priority axis of OP1<type='S' input='S'> |

ERDF/CF

<type='S' input='S'>

OP1<type='S' input='S'> | Priority axis of OP1<type='S' input='S'> |

ERDF/CF

<type='S' input='S'>

OP2<type='S' input='S'> | Priority axis of OP2<type='S' input='S'> |

ERDF/CF

<type='S' input='S'>

OP2<type='S' input='S'> | Priority axis of OP2<type='S' input='S'> |

ERDF/CF

<type='S' input='S'>

(a)

Please provide a short description of the project, its main objectives and the main project components.

In case of productive investments a short technical description must also be provided.

<type='S' maxlength='7000' input='M'>

(b)

Please provide a map identifying the project area and geo-referenced data [Please provide the geo-referenced data in vector format, containing polygons, lines and/or points as appropriate to represent the project in preferably shape file format.].

(c)

Please give below the timetable for the development of the major project and its implementation.

[Legend for the characteristics of fields: type: N = Number, D = Date, S = String, C = Checkbox, P = Percentage input: M = Manual, S = Selection, G = Generated by system max length = Maximum number of characters including spaces]

Start date

(A)

Completion date

(B)

1.

Feasibility studies (or business plan if productive investment):

<type='D' input='M'> | <type='D' input='M'>

2.

Cost-benefit analysis:

<type='D' input='M'> | <type='D' input='M'>

3.

Environmental impact assessment:

<type='D' input='M'> | <type='D' input='M'>

4.

Design studies:

<type='D' input='M'> | <type='D' input='M'>

5.

Preparation of tender documentation(s):

<type='D' input='M'> | <type='D' input='M'>

6.

Tender procedure(s):

<type='D' input='M'> | <type='D' input='M'>

7.

Land acquisition:

<type='D' input='M'> | <type='D' input='M'>

8.

Development consent:

<type='D' input='M'> | <type='D' input='M'>

9.

Construction phase/contract:

<type='D' input='M'> | <type='D' input='M'>

10.

Operational phase:

<type='D' input='M'> | <type='D' input='M'>

(d)

Please provide details on the expected contribution of the major project to achieving the result indicators under the specific objectives of the relevant priority axis or priority axes of the operational programme(s).

<type='S' maxlength='7000' input='M'>

EUR |

Total Project costs

(A)

Ineligible costs

(B)

Eligible costs

(C) = (A) – (B)

Percentage of total eligible costs

Input | Input | Calculated | Calculated

1 | Planning/design fees | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='G'> | <type='N' input='G'>

2 | Land purchase | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='G'> | <type='N' input='G'>

3 | Building and construction | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='G'> | <type='N' input='G'>

4 | Plant and machinery or equipment | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='G'> | <type='N' input='G'>

5 | Contingencies | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='G'> | <type='N' input='G'>

6 | Price adjustment (if applicable) | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='G'> | <type='N' input='G'>

7 | Publicity | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='G'> | <type='N' input='G'>

8 | Supervision during construction implementation | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='G'> | <type='N' input='G'>

9 | Technical assistance | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='G'> | <type='N' input='G'>

10 | Sub-total | <type='N' input='G'> | <type='N' input='G'> | <type='N' input='G'> | <type='N' input='G'>

11 | (VAT) | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='M'>

12 | TOTAL | <type='N' input='G'> | <type='N' input='G'> | <type='N' input='G'> | <type='N' input='G'>

Please provide the exchange rate and the reference (where applicable).

<type='S' maxlength='875' input='M'>

Please provide an explanation on any of the above elements, where relevant.

<type='S' maxlength='1750' input='M'>

In case the project involves the granting of State aid, please fill in the table below [This application does not replace notification to the Commission under Article 108(3) of the Treaty. A positive decision by the Commission on the major project under Regulation (EU) No 1303/2013 does not constitute state aid approval.].

[Gross grant equivalent (GGE) means the discounted value of the aid expressed as a percentage of the discounted value of the eligible costs, as calculated at the time of award of the aid on the basis of the reference rate applicable on that date.] [State aid rules include provisions on eligible cost. In this column Member States should indicate the total amount of eligible cost based on the State aid rules that have been applied.] [Commission Decision of 20 December 2011 on the application of Article 106(2) of the Treaty on the Functioning of the European Union to State aid in the form of public service compensation granted to certain undertakings entrusted with the operation of services of general economic interest (OJ L 7, 11.1.2012, p. 3).] [Regulation (EC) No 1370/2007 of the European Parliament and of the Council of 23 October 2007 on public passenger transport services by rail and by road and repealing Council Regulations (EEC) Nos 1191/69 and 1107/70 (OJ L 315, 3.12.2007, p. 1).]

Amount of aid (EUR) in GGE | Total amount of eligible cost (EUR) | Aid intensity (in %) | State aid number/registry number for block-exempted aid

Approved aid scheme or approved ad hoc aid | <type='N' input='M'> | <type='N' input='M'> | <type='P' input='M'> | <type='N' input='M'>

Aid falling under a block exemption regulation | <type='N' input='M'> | <type='N' input='M'> | <type='P' input='M'> | <type='N' input='M'>

Aid in line with the SGEI decision or the regulation on public land passenger traffic | <type='N' input='M'> | <type='N' input='M'> | <type='P' input='M'> | Not applicable

Total aid granted | <type='N' input='G'> | Not applicable | Not applicable | Not applicable

Please choose the relevant option and complete the information on the basis of the format for submission of information set out in accordance with Article 101 of Regulation (EU) No 1303/2013.

Method of calculation of the potential net revenue | Put x in one box only

Calculation of the discounted net revenue | <type='C' input='M'>

Flat rate method | <type='C' input='M'>

Decreased co-financing rate method | <type='C' input='M'>

Value

1.

| Total eligible cost before taking account of the requirements set out in Article 61 of Regulation (EU) No 1303/2013 (in EUR, not discounted) | <type='N' input='M'>

2.

| Pro-rata application of discounted net revenue (%) (if applicable) | <type='N' input='M'>

3.

|

Total eligible cost after taking into account of the requirements set out in Article 61 of Regulation (EU) No 1303/2013 (in EUR, not discounted) = (1)*(2)

The maximum public contribution must respect the State aid rules and the amount of total aid granted reported above (if applicable)

<type='N' input='M'>

Value

1.

| Total eligible cost before taking account of the requirements set out in Article 61 of Regulation (EU) No 1303/2013 (in EUR, not discounted) | <type='N' input='M'>

2.

| Net revenue flat rate as defined in Annex V to Regulation (EU) No 1303/2013 or delegated acts (FR) (%) | <type='N' input='M'>

3.

|

Total eligible cost after taking account of the requirements set out in Article 61 of Regulation (EU) No 1303/2013 (in EUR, not discounted) = (1)*(1-FR)*

The maximum public contribution must respect the State aid rules and the amount of total aid granted reported above (if applicable)

* In case of decreased co-financing rate method, this formula is not applicable (flat rate is reflected in co-financing rate of the priority axis, resulting in lower ERDF/CF financing) and the total eligible cost is equal to the amount mentioned in point (1)

<type='N' input='M'>

Source of financing total investment expenditure (EUR) | | Of which (for information)

Total investment cost

[C.1.12.(A)]

Union support | National public (or equivalent) | National private | Other sources (specify) | | EIB/EIF financing:

(a)

= (b) + (c) + (d) + (e) | (b) | (c) | (d) | (e) | | (f)

<type='N' input='G'> | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='M'> | | <type='N' input='M'>

The total eligible expenditure to be declared to the Commission shall be presented below in terms of the annual share in EUR. In the case of a major project co-financed by more than one operational programme, the annual plan shall be presented separately for each operational programme. In the case of a major project co-financed by more than one priority axis, the annual plan should be broken down by priority axis.

(in EUR) | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | Total eligible expenditure

Priority axis of OP1 | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='M'> | <type='N' input='G'>

Priority axis of OP1 | | | | | | | | | | |

Priority axis of OP2 | | | | | | | | | | |

Priority axis of OP2 | | | | | | | | | | |

Please list in the table provided output indicators, including common indicators as specified in the operational programme(s) and other physical indicators for monitoring progress. Volume of information will depend on complexity of projects, but only main indicators should be presented.

OP and priority axis | Name of indicator | Measurement unit | Target value for the major project | Target year

<type='S' input='S'> |

Common:

<type='S' input='S'>

Other:

<type='S' input='M'>

Common:

<type='S' input='S'>

Other:

<type='S' input='M'>

<type='S' input='M'> | <type='N' input='M'>

Please present a short summary of the main risks to the successful physical and financial implementation of the project and the proposed risk mitigation measures

<type='S' maxlength='3500' input='M'>

Yes | □ | No | □

If yes, please give details and justify the proposed contribution from the Union budget to the project in this respect:

<type='S' maxlength='3500' input='M'>

Yes | □ | No | □

If yes, please give details and justify the proposed contribution from the Union budget to the project in this respect:

<type='S' maxlength='3500' input='M'>

In addition, for productive investments please give details of the expected impact of the project on employment in other regions of the Union, and define whether the financial contribution from the Funds does not result in a substantial loss of jobs in existing locations within the Union.

<type='S' maxlength='3500' input='M'>

The independent experts declare that:

1.

They have fulfilled the requirements of Article 23(2)(b) of Commission Delegated Regulation (EU) No 480/2014.

2.

They have appraised the project in accordance with all the criteria set out in Annex II to that Regulation.

Member State |

Region and project location |

Project name |

Beneficiary |

Managing authority |

Independent experts reference |

[NAME and FUNCTION]

Independent experts

Signature:

DATE |

Please confirm that all of the following conditions are fulfilled: the operation is a major project within the meaning of Article 100 of Regulation (EU) No 1303/2013; the major project is not a completed operation within the meaning of Articles 2(14) and 65(6) of that Regulation; the major project is included within the relevant operational programme(s).

Put x where appropriate | Give details

Yes | <type='C' input='M'> | <type='S' maxlength='1750' input='M'>

No | <type='C' input='M'> | <type='S' maxlength='1750' input='M'>

Summarise relevant information on the body responsible for implementation of the major project, and its capacity including technical, legal, financial and administrative capacity.

<type='S' maxlength='3000' input='M'>

Give a clear statement whether or not the project meets the relevant criteria for quality review set out in Annex II to Commission Delegated Regulation (EU) No 480/2014 and justify this statement.

Put x where appropriate | Give a statement and justification

Yes | <type='C' input='M'> | <type='S' maxlength='1750' input='M'>

No | <type='C' input='M'> | <type='S' maxlength='1750' input='M'>

Summarise relevant information on the description of the investment and its location.

<type='S' maxlength='3000' input='M'>

Give a clear statement whether or not the project meets the relevant criteria for quality review set out in Annex II to Commission Delegated Regulation (EU) No 480/2014 and justify this statement.

Put x where appropriate | Give a statement and justification

Yes | <type='C' input='M'> | <type='S' maxlength='1750' input='M'>

No | <type='C' input='M'> | <type='S' maxlength='1750' input='M'>

Summarise relevant information on project objectives and its consistency with the relevant priority axes of the operational programme or operational programmes concerned, and its expected contribution to achieving the specific objectives and results of those priority axes and the expected contribution to socioeconomic development of the area covered by the operational programme, and measures taken by the beneficiary to ensure optimal utilisation of the infrastructure in the operation phase.

<type='S' maxlength='3000' input='M'>

Give a clear statement whether or not the project meets the relevant criteria for quality review set out in Annex II to Commission Delegated Regulation (EU) No 480/2014 and justify this statement.

Put x where appropriate | Give a statement and justification

Yes | <type='C' input='M'> | <type='S' maxlength='1750' input='M'>

No | <type='C' input='M'> | <type='S' maxlength='1750' input='M'>

4.1.

Summarise relevant information on the total cost, calculation of costs both in terms of its overall cost to achieve the expected objectives and unit costs, and total eligible cost taking into account requirements of Article 61 of Regulation (EU) No 1303/2013.

<type='S' maxlength='3000' input='M'>

Give a clear statement whether or not the project meets the relevant criteria for quality review set out in Annex II to Commission Delegated Regulation (EU) No 480/2014 and justify this statement.

Put x where appropriate | Give a statement and justification

Yes | <type='C' input='M'> | <type='S' maxlength='1750' input='M'>

No | <type='C' input='M'> | <type='S' maxlength='1750' input='M'>

4.2.

Provide information on compliance with State aid rules and how State aid rules have been taken into account in the calculation of the total public contribution to the project.

4.2.1

Please inform whether the independent experts, in accordance with Article 23(1) of Commission Delegated Regulation (EU) No 480/2014 or the Member State, have consulted the Commission on relevant State aid issues.

If the Commission has been consulted, please provide the date and reference of consultation and the date and reference of the reply and summarize the result of the consultation.

<type='S' maxlength='3000' input='M'>

4.2.2

If the Commission has not been consulted, please provide the following information:

Do you consider that this project involves the granting of State aid? <type='C' input='M'>

Yes | □ | No | □

If yes, please explain on what basis compliance with State aid rules is ensured. Please provide this information for all groups of potential State aid recipients, for example, in case of infrastructures, for the owner, the constructors, the operator and for the users of the infrastructure.

<type='S' maxlength='3000' input='M'>

If no, please explain in detail why you consider that the support does not constitute State aid. Please provide this information for all groups of potential State aid recipients (for example, in case of infrastructures potential aid recipients are: the owner of the infrastructure, the constructor, the operator and the users of the infrastructure) [The Commission services provided guidance to Member States to facilitate the assessment when infrastructure investments may involve State aid. In particular, the Commission services have prepared analytical grids. A Communication on the notion of aid is currently in preparation The Commission invites Member States to make use of the analytical grids and of the future communication for explaining why it is considered that the support does not involve the granting of State Aid.]. If applicable, please indicate whether the reason why you consider that the project does not involve State aid is that (i) the project does not concern any economic activity (including activities in the public remit) or that (ii) the recipient(s) of support enjoy a legal monopoly for the relevant activities and are not active in any other liberalised sector (or will keep separate accounts in case the recipient(s) are active in additional sectors).

<type='S' maxlength='3000' input='M'>

Give a clear statement whether or not the project meets the relevant criteria for quality review set out in Annex II to Commission Delegated Regulation (EU) No 480/2014 and justify this statement.

Put x where appropriate | Give a statement and justification

Yes | <type='C' input='M'> | <type='S' maxlength='1750' input='M'>

No | <type='C' input='M'> | <type='S' maxlength='1750' input='M'>

5.1.

Summarise relevant information on the feasibility studies carried out and the results under the following aspects: institutional, technical, environmental including climate change (if relevant) and other aspects.

<type='S' maxlength='3000' input='M'>

Give a clear statement whether or not the project meets the relevant criteria for quality review set out in Annex II to Commission Delegated Regulation (EU) No 480/2014 and justify this statement.

Put x where appropriate | Give a statement and justification

Yes | <type='C' input='M'> | <type='S' maxlength='1750' input='M'>

No | <type='C' input='M'> | <type='S' maxlength='1750' input='M'>

5.2.