Aid for 4G and 5G mobile network deployment shall be compatible with the internal market pursuant to Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled.
The eligible costs shall be all costs for the construction, management and operation of passive and active components of a mobile network. The maximum aid amount for a project shall be established on the basis of a competitive selection process as set out in paragraph 7, point (a). Where an investment is carried out in accordance with paragraph 7, point (b), without a competitive selection process, the aid amount shall not exceed the difference between the eligible costs and the normal operating profit of the investment. The operating profit shall be deducted from the eligible costs ex ante on the basis of reasonable projections and verified ex post through a claw-back mechanism. The reasonable projection of the measure requires that all costs and all revenues, which are expected to be incurred over the economic lifetime of the investment, shall be taken into account.
Mobile 5G network deployment shall be located in areas where there are no 4G and no 5G mobile networks existing or credibly planned to be deployed within the relevant time horizon. Mobile 4G network deployment shall be located in areas where there are no 3G, 4G or 5G mobile networks existing or credibly planned to be deployed within the relevant time horizon. These requirements shall be verified by mapping and public consultation in accordance with paragraph 4.
The mapping and public consultation for the purposes of paragraph 3 shall meet the following requirements cumulatively:
the mapping shall clearly identify the geographic target areas planned to be covered under the State intervention and shall take into account all existing mobile networks. Mapping shall be performed on the basis of maximum 100x100 metre grids. All the elements of the methodology and the underlying technical criteria used to map the target areas must be made publicly available. Mapping shall always be verified through a public consultation;
Where a network deployment includes, at the same time, the deployment of an access network and a limited deployment of the necessary ancillary backhaul network to enable the functioning of the access network, a separate mapping of backhaul networks is not required;
the public consultation shall be carried out by the competent public authority through the publication of the main characteristics of the planned State intervention and the list of geographic target areas identified in the mapping exercise in accordance with point (a). That information must be made available on a publicly accessible website at regional and national level. The public consultation shall invite interested parties to comment on the planned State intervention and to submit substantiated information in accordance with point (a) regarding their mobile networks with the characteristics set out in paragraph 3 that are existing or credibly planned to be deployed in the target area within the relevant time horizon. The public consultation shall last at least 30 days.
The aided infrastructure shall not be taken into account to meet the coverage obligations of the mobile networks operators that arise out of conditions attached to rights of use of 4G and 5G spectrum.
The intervention shall bring a significant improvement (step change) compared to the mobile networks existing or credibly planned to be deployed within the relevant time horizon, as identified through mapping and public consultation carried out in accordance with paragraph 4. Credibly planned networks shall be taken into account for the assessment of the step-change only if they would, on their own, provide similar performance to that of the planned State funded network in the target areas within the relevant time horizon. A step change takes place if, as a result of the subsidised intervention, a significant new investment in the mobile network is undertaken and the subsidised network brings significant new capabilities to the market in terms of mobile service availability, capacity, speeds and competition compared to the existing or credibly planned networks within the relevant time horizon. The intervention shall include more than 50 % investment in broadband infrastructure.
The aid shall be granted as follows:
the aid shall be allocated on the basis of an open, transparent and non-discriminatory competitive selection procedure in line with the principles of public procurement rules and respecting the principle of technology neutrality, based on the most economically advantageous offer;
when the aid is granted without a competitive selection procedure to a public authority to deploy and manage, directly or through an in-house entity, a mobile network, the public authority or the in-house entity, as the case may be, shall provide only wholesale services using the subsidised network. Any concession or other entrustment to a third party to build or operate the network shall be allocated through an open, transparent and non-discriminatory competitive selection process, in line with the principles of public procurement rules and respecting the principle of technology neutrality, based on the most economically advantageous offer.
The operation of the subsidised network shall offer wholesale access, as defined in Article 2, point (139), under fair and non-discriminatory conditions. Active wholesale access shall be granted for at least 10 years from the start of the operation of the network and wholesale access to the broadband infrastructure shall be granted for the lifetime of the elements concerned. The same access conditions shall apply on the entirety of the network, including on the parts of such network where existing infrastructures have been used. The access obligations shall be enforced irrespective of any change in ownership, management or operation of the network. In order to render the wholesale access effective and to enable the access seekers to provide services, wholesale access shall also be granted to parts of the network that have not been State funded or that may not have been deployed by the aid beneficiary, such as by granting access to active equipment even if only broadband infrastructure is financed.
The wholesale access price shall be based on one of the following benchmarks and pricing principles:
the average published wholesale prices that prevail in other comparable and more competitive areas of the Member State;
the regulated prices already set or approved by the national regulatory authority for the markets and services concerned;
cost orientation or a methodology mandated in accordance with the sectorial regulatory framework.
Without prejudice to the competences of the national regulatory authority under the regulatory framework, the national regulatory authority shall be consulted on the wholesale access products, the terms and conditions for access, including on prices, and on disputes related to the application of this Article.
Member States shall put in place a monitoring and claw-back mechanism if the amount of aid granted to the project exceeds EUR 10 million.
The use of the State funded mobile 4G or 5G network to provide fixed wireless access services shall only be allowed in areas where there is no network providing speeds of at least 100 Mbps download under peak-time conditions existing or credibly planned to be deployed within the relevant time horizon, if the following cumulative conditions are met:
the mapping and public consultation exercise take into account the fixed broadband networks existing or credibly planned determined according to Article 52(5);
the supported 4G or 5G fixed wireless access network shall at least triple the download speed compared to the existing or credibly planned networks (target speed) according to Article 52(5).
To ensure that aid remains proportional and does not lead to overcompensation or cross-subsidisation of non-aided activities, the aid beneficiary shall ensure accounting separation between the funds used for the deployment and the operation of the State funded network and other funds at its disposal.