Name and department of organisation:
Name of contact person:
Job title of contact person:
Address:
International telephone number:
E-mail:
Questions in this section are to be answered in the report due by 30 June 2014 and in subsequent reports if changes have occurred during the reporting period.
2.1. In the table below, please state the name, abbreviation and contact details of the competent authorities involved in the implementation of EU ETS for installations and aviation in your Member State. Add further rows if necessary.
[Please provide the telephone number, e-mail address and website address.]
Name | Abbreviation | Contact details
In the table below, please state the name, abbreviation and contact details of the national accreditation body appointed pursuant to Article 4(1) of Regulation (EC) No 765/2008 of the European Parliament and of the Council [OJ L 218, 13.8.2008, p. 30.].
Name | Abbreviation | Contact details (1)
Have you set up a national certification authority to certify verifiers pursuant to Article 54(2) of Commission Regulation (EU) No 600/2012 [OJ L 181, 12.7.2012, p. 1.]? Yes/No
If yes, please state the name, abbreviation and contact details of the national certification authority using the table below.
Name | Abbreviation | Contact details (1)
In the table below, please state the name, abbreviation and contact details of the registry administrator in your Member State.
Name | Abbreviation | Contact details (1)
2.2. In the table below, please indicate which competent authority is responsible for the following tasks, using their abbreviation. Add further rows if necessary.
Please note that if a box in the table below is grey, the task is not relevant for either installations or aviation.
[This box needs only to be completed if the Member State has included activities or gases under Article 24 of Directive 2003/87/EC.] [This box needs only to be completed if the Member State has excluded installations under Article 27 of Directive 2003/87/EC.]
Competent authority in charge of: | Installations | Aviation
Issuance of permits | |
Free allocation to stationary installations pursuant to Article 10a of Directive 2003/87/EC | |
Free allocation pursuant to Articles 3e and 3f of Directive 2003/87/EC | |
Activities related to auctioning (the auctioneer mentioned in Commission Regulation (EU) No 1031/2010) (OJ L 302, 18.11.2010, p. 1) | |
Financial measures with respect to indirect carbon leakage | |
Issuance of allowances | |
Approval of the monitoring plan and significant changes to the monitoring plan | |
Receiving and assessing verified emissions reports and verification reports | |
Making a conservative estimation of emissions according to Article 70 of Commission Regulation (EU) No 601/2012 (OJ L 181, 12.7.2012, p. 30) | |
Approval of improvement reports according to Article 69 of Regulation (EU) No 601/2012 | |
Approval of the operator’s application to waive a verifier’s site visit pursuant to Article 31(1) of Regulation (EU) No 600/2012 | |
Inspection and enforcement | |
Information to the public | |
Administration of unilateral inclusion of activities and gases under Article 24 of Directive 2003/87/EC | |
Administration of installations excluded under Article 27 of Directive 2003/87/EC | |
Other, please specify: | |
2.3. If more than one competent authority is designated in your Member State pursuant to Article 18 of Directive 2003/87/EC, which competent authority is your focal point referred to in Article 69(2) of Regulation (EU) No 600/2012? Please answer using the abbreviation concerned in the table below.
Name of the competent authority that is the focal point referred to in Article 69(2) of Regulation (EU) No 600/2012 | Abbreviation
If more than one competent authority is designated in your Member State to carry out the activities in Regulation (EU) No 601/2012, what measures have been taken to coordinate the work of those competent authorities in accordance with Article 10 of Regulation (EU) No 601/2012? Please answer using the table below. Add further rows if necessary.
Coordination of activities with respect to Article 10 of Regulation (EU) No 601/2012 | Yes/No | Comments (optional)
Does national legislation require a central competent authority to review and provide binding instructions on monitoring plans, notifications of changes to the monitoring plan or emissions reports? | |
Does a central competent authority steer local and/or regional competent authorities by giving binding instructions and guidance? | |
Does a central competent authority review and provide advice on monitoring plans, notifications and emissions reports on a voluntary basis? | |
Are regular working groups or meetings organised with the competent authorities? | |
Is common training organised for all competent authorities to ensure consistent implementation of requirements? | |
Are IT systems or tools used to ensure common approaches to monitoring and reporting issues? | |
Is a coordination group established, with competent authority staff, which discusses monitoring and reporting issues and develops common approaches? | |
Are there other coordination activities? If yes, please specify:
2.4. What effective exchange of information and cooperation has been established in accordance with Article 69(1) of Regulation (EU) No 600/2012 between the national accreditation body or, if relevant, the national certification authority and the competent authority within your Member State? Please answer using the table below. Add further rows if necessary.
Coordination of activities with respect to Article 69(1) of Regulation (EU) No 600/2012 | Yes/No | Comments (optional)
Are regular meetings organised between the national accreditation body/national certification authority (if relevant) and the competent authority responsible for the coordination? | |
Has a working group been established where the national accreditation body/national certification authority (if relevant), the competent authority and verifiers discuss accreditation and verification issues? | |
Can the competent authority accompany the national accreditation body in accreditation activities as an observer? | |
Are there other coordination activities? If yes, please specify:
The second sub-question of question 3.1 and the second and third sub-questions of question 3.2 in this section are to be answered in the report due by 30 June 2014 and in subsequent reports if changes have occurred during the reporting period.
3.1. How many installations carry out activities and emit greenhouse gas emissions listed in Annex I to Directive 2003/87/EC? How many of those installations are category A, B and C installations as referred to in Article 19(2) of Regulation (EU) No 601/2012? How many are installations with low emissions as referred to in Article 47(2) of Regulation (EU) No 601/2012? Please answer using the table below.
Installations | Number
Installations with low emissions |
Category A installations |
Category B installations |
Category C installations |
Total number of installations |
For which Annex I activities has your Member State issued permits under Directive 2003/87/EC? Please answer using the table below.
Annex I activity | Yes/No
Combustion activities as specified in Annex I to Directive 2003/87/EC |
Refining of mineral oil |
Production of coke |
Metal ore (including sulphide ore) roasting or sintering, including pelletisation |
Production of pig iron or steel as specified in Annex I to Directive 2003/87/EC |
Production or processing of ferrous metals as specified in Annex I to Directive 2003/87/EC |
Production of primary aluminium |
Production of secondary aluminium as specific in Annex I to Directive 2003/87/EC |
Production or processing of non-ferrous metals as specified in Annex I to Directive 2003/87/EC |
Production of cement clinker in rotary kilns as specified in Annex I to Directive 2003/87/EC |
Production of lime or calcination of dolomite or magnesite as specified in Annex I to Directive 2003/87/EC |
Manufacture of glass as specified in Annex I to Directive 2003/87/EC |
Manufacture of ceramic products as specified in Annex I to Directive 2003/87/EC |
Manufacture of mineral wool insulation material using glass, rock or slag as specified in Annex I to Directive 2003/87/EC |
Drying or calcination of gypsum or production of plaster boards and other gypsum products, as specified in Annex I to Directive 2003/87/EC |
Production of pulp as specified in Annex I to Directive 2003/87/EC |
Production of paper or cardboard as specified in Annex I to Directive 2003/87/EC |
Production of carbon black as specified in Annex I to Directive 2003/87/EC |
Production of nitric acid |
Production of adipic acid |
Production of glyoxal and glyoxylic acid |
Production of ammonia |
Production of bulk organic chemicals as specified in Annex I to Directive 2003/87/EC |
Production of hydrogen (H2) and synthesis gas as specified in Annex I to Directive 2003/87/EC |
Production of soda ash (Na2CO3) and sodium bicarbonate (NaHCO3) as specified in Annex I to Directive 2003/87/EC |
Capture of greenhouse gases from installations as specified in Annex I to Directive 2003/87/EC |
Transport of greenhouse gases by pipelines for geological storage in a storage site permitted under Directive 2009/31/EC of the European Parliament and of the Council (OJ L 140, 5.6.2009, p. 114) |
Geological storage of greenhouse gases in a storage site permitted under Directive 2009/31/EC |
3.2. Have you excluded installations under Article 27 of Directive 2003/87/EC? Yes/No
If yes, please complete the table and the questions below.
Main Annex I activity | Total emissions of installations excluded under Article 27 of Directive 2003/87/EC | Number of installations that have exceeded the threshold of 25000 tonnes of CO2(e) and need to re-enter the emissions trading scheme
What verification measures have been implemented pursuant to Article 27 of Directive 2003/87/EC? Please specify below.
Have any simplified monitoring, reporting and verification requirements been established for installations whose annual verified emissions between 2008 and 2010 are below 5000 tonnes of CO2(e) a year? Yes/No
If yes, please indicate below what simplified requirements apply.
3.3. How many aircraft operators are carrying out activities listed in Annex I to Directive 2003/87/EC for which you are responsible as administering Member State and have submitted a monitoring plan? How many of those aircraft operators are commercial aircraft operators and non-commercial aircraft operators? How many of the total number of aircraft operators are small emitters as referred to in Article 54(1) of Regulation (EU) No 601/2012? Please specify using the table below.
Type of aircraft operators | Number
Commercial aircraft operators |
Non-commercial aircraft operators |
Total number of aircraft operators |
Small emitters |
Are you aware of any additional aircraft operators for which you are responsible as administering Member State that should have submitted a monitoring plan and complied with other requirements under Directive 2003/87/EC? Yes/No
If yes, please specify the number of aircraft operators in the table below.
Total number of additional aircraft operators that should have complied with the EU ETS requirements |
If you would like to raise issues related to the number of these additional aircraft operators, please specify below.
Question 4.1 and the first part of question 4.2 are to be answered in the report due by 30 June 2014 and in subsequent reports if changes have occurred during the reporting period.
4.1. Have the requirements specified in Articles 5, 6 and 7 of Directive 2003/87/EC been integrated into the procedures as required by Directive 2010/75/EU of the European Parliament and of the Council [OJ L 334, 17.12.2010, p. 17.]? Yes/No
If yes, please specify in the table below how the integration was carried out. Add further rows if necessary.
Integration of the greenhouse gas emission permit (ETS permit) and the Industrial Emissions Directive (IED) permit | Yes/No | Comments (optional)
Is the ETS permit part of the IED permit? | |
Are the permitting procedures under the IED Directive and ETS permit integrated? | |
Are the approval of monitoring plans and assessment of emissions reports carried out by IED regulators? | |
Is inspection of the EU ETS activities carried out by the IED regulators? | |
Is the integration carried out in another way? If yes, please specify:
If no, please specify in the table below how the coordination of conditions and procedures for the issue of the ETS permit and the IED permit are carried out. Add further rows if necessary.
Coordination of conditions and procedures for the issue of the ETS permit and the IED permit | Yes/No | Comments (optional)
IED regulators check whether an ETS permit is applicable and necessary, and inform the competent authority responsible for the activities under the EU ETS | |
The legislation which transposes the IED Directive does not include emission or concentration limits for CO2 | |
IED regulators give binding instructions to the competent authority responsible for emissions trading during the permitting procedure | |
IED regulators give advice on a voluntary and non-binding basis to the competent authority responsible for emissions trading during the permitting procedure | |
Is the coordination carried out in another way? If yes, please specify:
4.2. When does national law require the permit to be updated in accordance with Article 6 and 7 of Directive 2003/87/EC? Please provide details of the provisions in national law in the table below. Add further rows if necessary.
Category of changes | Details of provisions in national law
When can permits be withdrawn by the competent authority? |
Does a permit expire under national law? If yes, under what circumstances? |
When is a permit changed as a result of an increase in capacity? |
When is a permit changed as a result of a decrease in capacity? |
When is a permit changed as a result of changes to the monitoring plan? |
Are there other types of permit updates? If yes, please provide details: |
What is the total number of permit updates that occurred in the reporting period? Please specify in the table below the number of permit updates as far as this is known to the competent authority.
Total number of permits updated in the reporting period |
Question 5.1, 5.2, 5.3 and 5.4 are to be answered in the report due by 30 June 2014 and in subsequent reports if changes have occurred during the reporting period.
5.1. Has additional national legislation been implemented to assist in the application of Regulation (EU) No 601/2012? Yes/No
If yes, please specify below for which areas additional national legislation has been implemented.
Has additional national guidance been developed to support the understanding of Regulation (EU) No 601/2012? Yes/No
If yes, please specify below for which areas additional national guidance has been developed.
5.2. What measures have been taken to complement the reporting requirements of other existing reporting mechanisms such as greenhouse gas inventory reporting and EPRTR reporting? Please specify below.
5.3. Have you developed Member State customised electronic templates or specific file formats for monitoring plans, emissions reports, verification reports and/or improvement reports? Yes/No
If yes, please complete the tables below.
[Please select Member State specific template or Member State specific file format.] [Compared to the requirements of the Commission published template and specific file formats.]
Member State specific template or file format | What elements of the template or specific file format are Member State specific?
Monitoring plan for installations | |
Emissions report for installations | |
Verification report for installations | |
Improvement report for installations | |
[Please select Member State specific template or Member State specific file format.] [Compared to the requirements of the Commission published template and specific file formats.]
Member State specific template or file format | What elements of the template or specific file format are Member State specific?
Monitoring plan for aircraft operators | |
Emissions report for aircraft operators | |
Verification report for aircraft operators | |
Improvement report for aircraft operators | |
What measures have you implemented to comply with the requirements in Article 74(1) and (2) of Regulation (EU) No 601/2012? Please specify below.
5.4. Have you developed an automated system for electronic data exchange between operators or aircraft operators and the competent authority and other parties? Yes/No
If yes, please specify below what provisions you have implemented to comply with the requirements in Article 75(1) and (2) of Regulation (EU) No 601/2012.
Questions 5.7, 5.9, the second sub-question of 5.17 and the questions 5.19 and 5.20 are to be answered in the report due by 30 June 2014 and in subsequent reports if changes have occurred during the reporting period.
5.5. In the table below, please complete, for the fuels listed, the total fuel consumption and total annual emissions based on data reported in the operator’s emissions reports for the reporting year.
[Please note that this question does not cover biomass (including non-sustainable biofuels and bioliquids). Information concerning biomass, biofuels and bioliquids is covered by question 5.17.]
Fuel type description | Total fuel consumption (TJ) | Total annual emissions (t CO2)
Hard coal | |
Lignite and sub-bituminous coal | |
Peat | |
Coke | |
Natural gas | |
Coke oven gas | |
Blast furnace gas | |
Refinery gas and other process derived gases | |
Fuel oil | |
Liquefied petroleum gas | |
Petroleum coke | |
Other fossil fuels | |
5.6. In the table below, please complete the aggregate total emissions for each reported IPCC Common Reporting Format (CRF) category based on the data provided in the operator’s emissions reports in accordance with Article 73 of Regulation (EU) No 601/2012.
CRF Category 1
(Energy)
CRF Category 2
(Process emissions)
Total emissions
(t CO2(e))
Total combustion emissions
(t CO2(e))
Total process emissions
(t CO2(e))
5.7. In the table below, please indicate:
the number of installations for which the competent authority has approved literature values referred to in Article 31(1)(c) of Regulation (EU) No 601/2012;
the value, fuel type and calculation factor concerned as well as the source and justification for these literature values;
the number of installations for which the competent authority has approved Type I default values, i.e. values referred to in Article 31(1)(d) and (e) of Regulation (EU) No 601/2012;
the value, fuel type or material type and calculation factor concerned as well as the source and justification for these Type I default values.
[Please select under the type of value: the literature value agreed with the competent authority or Type I default value. Literature values referred to in Article 31(1)(c) of Regulation (EU) No 601/2012 are related to calculation factors concerning fuel types.] [Please select under calculation factor: net calorific value, emission factor, oxidation factor, conversion factor, carbon content or biomass fraction.]
Type of value | Fuel or material type | Calculation factor | Value used in practice | Source of the value and its justification | Number of installations for which the competent authority has approved the value
How many of the Type I default values are values listed in Annex VI to Regulation (EU) No 601/2012 as referred to in Article 31(1)(a) of that Regulation?
Total number of Type I default values that are values as referred to in Article 31(1)(a) of Regulation (EU) No 601/2012 |
5.8. Have sampling plans been drawn up in all cases required under Article 33 of Regulation (EU) No 601/2012? Yes/No
If no, please indicate below the cases and reasons for not drawing up a sampling plan.
Are you aware of any particular problems or issues concerning sampling plans set-up by operators? Yes/No
If yes, please specify below problems or issues that have arisen.
5.9. In the table below, please indicate the number of installations for which the competent authority has allowed a different frequency in accordance with Article 35(2)(b) of Regulation (EU) No 601/2012 as well as confirmation that the sampling plan in those cases is fully documented and adhered to.
Name of fuel or material | Number of installations for which the competent authority has allowed a different frequency | Number of major source streams for which a different frequency is applied |
Confirmation that the sampling plan is fully documented and adhered to
Yes/No. If no, please specify the reason
5.10. If the highest tier approaches for major source streams of category C installations referred to in Article 19(2)(c) of Regulation (EU) No 601/2012 are not applied, please indicate in the table below, for each installation for which this situation occurred, the affected source streams, the affected monitoring parameter, the highest tier required under Regulation (EU) No 601/2012 and the tier applied.
[Installation identification code recognised in accordance with Regulation (EU) No 389/2013.] [Please select under affected monitoring parameter: quantity of fuel, quantity of material, net calorific value, emission factor, preliminary emission factor, oxidation factor, conversion factor, carbon content, biomass fraction, or in the case of a measurement based methodology: the annual average hourly emissions in kg/h from the emission source.]
Installation identification code | Affected source stream in the calculation based methodology | Affected emission source in the measurement based methodology | Affected monitoring parameter | Highest tier required under Regulation (EU) No 601/2012 | Tier applied in practice
5.11. In the table below, please indicate the number of category B installations referred to in Article 19(2)(b) of Regulation (EU) No 601/2012 that do not apply the highest tier for all major source streams and all major emission sources [Emission sources which emit more than 5000 tonnes of CO2(e) per year or which contribute more than 10 % of the total annual emissions of the installation, whichever is higher in terms of absolute emissions.] in accordance with Regulation (EU) No 601/2012.
[Please select: calculation based methodology or measurement based methodology.]
Monitoring methodology | Main Annex I activity | Number of installations affected
5.12. Have installations in your Member State applied the fall-back approach in accordance with Article 22 of Regulation (EU) No 601/2012? Yes/No
If yes, please complete the table below.