Directive (EU) 2010/75
Directive 2010/75/EU of the European Parliament and of the Council of 24 November 2010 on industrial emissions (integrated pollution prevention and control) (recast) (Text with EEA relevance)
In forceTypedirectiveDate24 Nov 2010Since20 Jan 2010Articles102Versions held91Cited by654 documentsLast changed4 Aug 2024
- 10Scope
- 11General principles governing the basic obligations of the operator
- 12Applications for permits
- 13BAT reference documents and exchange of information
- 14Permit conditions
- 14aEnvironmental management system
- 15Emission limit values, environmental performance limit values, equivalent parameters and technical measures
- 15aCompliance assessment
- 16Monitoring requirements
- 17General binding rules for activities listed in Annex I
- 18Environmental quality standards
- 19Developments in best available techniques
- 20Changes by operators to installations
- 21Reconsideration and updating of permit conditions by the competent authority
- 22Site closure
- 23Environmental inspections
- 24Access to information and public participation in the permit procedure
- 25Access to justice
- 26Transboundary effects
- 27Emerging techniques
- 27aInnovation centre for industrial transformation and emissions
- 27bTesting of emerging techniques
- 27cEmission levels and indicative environmental performance values associated with emerging techniques
- 27dTransformation towards a clean, circular and climate-neutral industry
- 27eDeep industrial transformation
- 28Scope
- 29Aggregation rules
- 30Emission limit values
- 31Desulphurisation rate
- 32Transitional National Plan
- 33Limited life time derogation
- 34Small isolated systems
- 34aCombustion plants that are part of a small isolated system
- 35District heating plants
- 36Geological storage of carbon dioxide
- 37Malfunction or breakdown of the abatement equipment
- 38Monitoring of emissions into air
- 39Compliance with emission limit values
- 40Multi-fuel firing combustion plants
- 41Implementing rules
- 42Scope
- 43Definition of residue
- 44Applications for permits
- 45Permit conditions
- 46Control of emissions
- 47Breakdown
- 48Monitoring of emissions
- 49Compliance with emission limit values
- 50Operating conditions
- 51Authorisation to change operating conditions
- 52Delivery and reception of waste
- 53Residues
- 54Substantial change
- 55Reporting and public information on waste incineration plants and waste co-incineration plants
- ANNEX I Categories of activities referred to in Article 10
- 2 ANNEX Ia Activities referred to in Article 70a
- 3 ANNEX II Principles to be complied with when granting a derogation referred to in Article 15(5)
- ANNEX III Criteria for determining best available techniques
- ANNEX IV Public participation in decision-making
- ANNEX V Technical provisions relating to combustion plants
- 7 ANNEX VI Technical provisions relating to waste incineration plants and waste co-incineration plants
- 8 ANNEX VII Technical provisions relating to installations and activities using organic solvents
- ANNEX VIII Technical provisions relating to installations producing titanium dioxide
- ANNEX IX
- ANNEX X Correlation Table
Source: EU legislation in force, consolidated versions and treaties (Cellar, Publications Office). Official publication. Reuse: Reuse authorised (Commission Decision 2011/833/EU).