An EC certificate of verification for a subsystem that contains interoperability constituents which do not have an EC declaration of conformity or suitability for use may be issued during a transition period ending on 1 January 2024, provided the provisions set out in Section 6.3 of the Annex are met.
The production or upgrade/renewal of the subsystem using non-certified interoperability constituents shall be completed within the transition period set out in paragraph 1, including placing on the market.
During the transition period set out in paragraph 1:
the reasons for non-certification of any interoperability constituents shall be properly identified in the verification procedure referred to in paragraph 1;
the national safety authorities shall report on the use of non-certified interoperability constituents in the context of authorisation procedures in their annual report referred to in Article 19 of Directive (EU) 2016/798 of the European Parliament and of the Council [Directive (EU) 2016/798 of the European Parliament and of the Council of 11 May 2016 on railway safety (OJ L 138, 26.5.2016, p. 102).].
After a transition period ending on 1 January 2015, newly produced interoperability constituents of ‘rear-end signals’, shall be covered by the required EC declaration of conformity.