38 III. ASSESSMENT › Market analysis › Production and first sale of EEG electricity, Decision_act (EU) 2012/218

In forcesince 24 Apr 2012

The EEG installation operators have also the possibility to do ‘direct marketing’ of the electricity produced. This means that an EEG plant operator can renounce to the statutory remuneration and opt to sell the electricity directly on the spot market. Due to the high generation costs of EEG electricity, direct marketing outside of the statutory conditions is normally not a viable option. In the past, this method has mainly been used to a limited extent in instances where the buyers were able to achieve an exemption from the extra EEG fee by combining a certain amount of EEG electricity sourced directly from a producer with conventional electricity [This phenomenon has been sometimes referred to as ‘Grünstromprivileg’.]. With the new EEG law which entered into force beginning of 2012, the possibility for this specific exemption was limited which is expected to reduce this form of direct marketing [The Transmission System Operators estimate the share of such direct marketing (§33b EEG (2012)) at 3,7 % in 2012. See http://www.eeg-kwk.net/de/file/111115_Eckwerte_Einspeisung_final.pdf].