Article 13(1) of Directive 2010/75/EU requires the Commission to organise an exchange of information between it and Member States, the industries concerned and non-governmental organisations promoting environmental protection in order to draw up, review and, where necessary, update BAT reference documents (hereafter ‘BREFs’).
Article 13(2) of Directive 2010/75/EU, also requires that that exchange of information shall, in particular, address the following:
the performance of installations and techniques in terms of emissions, expressed as short- and long-term averages, where appropriate, and the associated reference conditions, consumption and nature of raw materials, water consumption, use of energy and generation of waste;
the techniques used, associated monitoring, cross-media effects, economic and technical viability and developments therein;
best available techniques and emerging techniques identified after considering the issues mentioned in points (a) and (b).
A best available techniques (BAT) reference document (BREF), resulting from this exchange of information, is defined in Article 3(11) of Directive 2010/75/EU. It is a document drawn up for defined activities describing, in particular, applied techniques, present emission and consumption levels, techniques considered for the determination of BAT as well as BAT conclusions and any emerging techniques, giving special consideration to the criteria listed in Annex III to Directive 2010/75/EU. Therefore, by definition, a BREF is a descriptive document and it does not prescribe the use of any technique or specific technology, nor does it interpret Directive 2010/75/EU.
Best available techniques (BAT) are defined in Article 3(10) of Directive 2010/75/EU as the most effective and advanced stage in the development of activities and their methods of operation which indicates the practical suitability of particular techniques for providing the basis for emission limit values and other permit conditions designed to prevent and, where that is not practicable, to reduce emissions and the impact on the environment as a whole:
‘techniques’ includes both the technology used and the way in which the installation is designed, built, maintained, operated and decommissioned;
‘available techniques’ means those developed on a scale which allows implementation in the relevant industrial sector, under economically and technically viable conditions, taking into consideration the costs and advantages, whether or not the techniques are used or produced inside the Member State in question, as long as they are reasonably accessible to the operator;
‘best’ means most effective in achieving a high general level of protection of the environment as a whole.
Article 3(12) of Directive 2010/75/EU also defines ‘BAT conclusions’ as the parts of a BREF laying down the conclusions on BAT, their description, information to assess their applicability, the emission levels associated with the BAT, associated monitoring, associated consumption levels and, where appropriate, relevant site remediation measures. The BAT conclusions are to be adopted through the procedure referred to in Article 75(2) of Directive 2010/75/EU. They shall be the reference for setting permit conditions for the installations covered by Directive 2010/75/EU.
The aim of a BREF is to determine BAT and to limit imbalances in the Union as regards the level of emissions from industrial activities. BREFs should provide information to the competent authorities of Member States, industrial operators, the Commission and the public at large on what BAT and emerging techniques are for the activities covered by Directive 2010/75/EU. The process of determining BAT and emerging techniques should be transparent and objective, based on sound technical and economic information. A BREF should also serve as a driver towards improved environmental performance across the Union.
To serve its main aim and ensure its user-friendliness, the content of the BREF should be limited to the relevant information for enabling the determination of BAT and the associated environmental performance levels as set out in Chapter 3 [Unless otherwise specified, the term ‘Chapter’ refers to the chapters of this Annex.] and emerging techniques in the context of implementing Directive 2010/75/EU. A BREF is not meant to be a textbook on techniques to prevent and control pollution. Extensive literature exists on the subject to which the BREF can refer where needed. However, it is essential that the BREF provide information on the main techniques that were considered by the technical working group (TWG) (see Section [Unless otherwise specified, the term ‘Section’ refers to the sections of this Annex.] 4.4) for the determination of BAT, and on the grounds for the BAT conclusions reached by the TWG.
BREFs may either be restricted to issues related to particular industrial activities (‘vertical’ BREFs) or may deal with cross-sectoral issues (‘horizontal’ BREFs [In addition, the Commission may decide to develop a number of guidance documents which may eventually replace some of the horizontal BREFs.]).
‘Horizontal’ and ‘vertical’ BREFs should be developed so as to be complementary for the purpose of setting permit conditions for installations covered by Directive 2010/75/EU. ‘Vertical’ BREFs may include information on techniques which can help TWGs in deriving BAT for other sectors. ‘Horizontal’ BREFs shall include information of a generic nature that can be used across many activities which fall under the scope of Directive 2010/75/EU. Information should be included in ‘horizontal’ BREFs where this supplements the information contained in ‘vertical’ BREFs on aspects that cut across several industrial sectors. This should not result in conflicting conclusions between ‘vertical’ and ‘horizontal’ BREFs. In order to facilitate the use of both ‘vertical’ and ‘horizontal’ BREFs in a complementary way, appropriate cross-references need to be made in a BREF to other relevant ‘vertical’ and ‘horizontal’ BREFs.
The Commission organises and coordinates the exchange of information through the involvement of the European IPPC Bureau (EIPPCB) (within DG Joint Research Centre) and DG Environment. The stakeholders involved in the exchange of information as provided for in Article 13(1) of Directive 2010/75/EU (Member States, industries concerned, environmental NGOs, and the Commission) oversee the process through the Forum established according to Article 13(3) of Directive 2010/75/EU. They contribute to the drawing up and reviewing of BREFs by participating in the technical working groups (TWGs). More information on the role of the stakeholders and the functioning of the Forum and the TWGs is given in Chapter 4.
The decision to draw up a BREF or to start reviewing a BREF is taken by the Commission. In accordance with Article 13(3)(b), it takes into account the opinion of the Forum on the work programme for the exchange of information.
Since some activities are included in Annex I to Directive 2010/75/EU which were not covered in Annex I to Directive 2008/1/EC of the European Parliament and of the Council [OJ L 24, 29.1.2008, p. 8.], new BREFs need to be drawn up.
The workflow for the drawing up of a new BREF presents many similarities with the workflow for the review of a BREF described in Section 1.2.4. The main differences are that for newly drafted BREFs ‘wishes’ (see Section 4.6) may not be required, that the collection of more information is needed and that two formal drafts of the BREF are generally expected before holding the final TWG meeting.
The reviewing of BREFs is a continuing process, due to the dynamic nature of BAT. For example, new measures and techniques may emerge, science and technologies are continuously developing, and new or emerging processes are being successfully introduced into the industry. In order to reflect such changes and their consequences for the BAT, BREFs have to be periodically reviewed and, if necessary, updated accordingly. This is explicitly addressed by recital 13 of Directive 2010/75/EU, which indicates that the Commission should aim to update the BREFs no later than eight years after the publication of the previous version.
The decision to review a BREF should take into account information in the chapter of the BREF entitled ‘Emerging techniques’ and in the section of the BREF entitled ‘Concluding remarks and recommendations for future work’ (see Section 2.2) together with other factors such as an indication that new techniques might be available, the need to expand the scope of the BREF, and the need to include products/substances or processes that were not yet covered.
The objective of a BREF review is to identify evolutions in BAT. This is achieved primarily by examining the parts of the BREF laying down the conclusions on BAT and by revising or updating those conclusions where new information is available that allows for doing so.
The review of a BREF is, therefore, not expected to involve a complete rewrite or modification of the whole BREF. It is, however, recognised that in some cases the first reviews of BREFs could involve substantially more modifications than subsequent reviews.
Clearly, the most relevant new information that needs to be identified, collected and submitted in the framework of the exchange of information for a BREF review is that which might lead to revised or updated BAT conclusions. For this purpose, it is crucial that data be collected on the basis of the guidance laid down in Chapter 5.
Additionally, the review of a BREF should include:
updating and complementing old background information on the basis of more recent data;
removing obsolete and outdated information;
correcting errors and removing any inconsistencies with other BREFs.
The review of a BREF will mainly focus on chapters of the BREF entitled ‘Techniques to consider in the determination of BAT’, ‘Best available techniques (BAT) conclusions’ and ‘Emerging techniques’ and, to a lesser extent, on chapters of the BREF entitled ‘Applied processes and techniques’ (in case of important changes in this chapter) and ‘Current emission and consumption levels’. The review of the other chapters of the BREF should be given a lower priority.
Overall, there is a need to ensure that all the information that remains within the BREF is as up to date, as consistent and as accurate as reasonably achievable.
The typical workflow for the drawing up and reviewing of BREFs (see Appendix 2) includes as major milestones a kick-off meeting, one or two formal drafts of the BREF and a final TWG meeting (see Section 4.6.2.3). Depending on the type of process (drawing up or reviewing of a BREF), the following variants of the workflow exist:
for a new BREF, or a BREF review with a major scope expansion, two formal drafts are generally considered necessary; the overall process in these cases should take between 31 and 39 months;
for the first review of a BREF without a major scope expansion two formal drafts may be necessary, although as a general rule one formal draft of the BREF is expected to be sufficient; and hence the process will generally take between 24 and 29 months (in the case of one formal draft or between 29 and 39 months in the case of two formal drafts);
for subsequent reviews of a BREF without a major scope expansion, one formal draft is expected to be sufficient and the process should take between 24 and 29 months.
These workflow variants are reference points for the TWGs. They can be adapted by the EIPPCB after consultation of the TWG to the specifics of particular BREF, also taking into account the experience gained from the drawing up and reviewing of other BREFs. The main steps for the drawing up and reviewing of BREFs and their timescales are described in more detail in Table 1.
These steps take into account the aim set out in recital 13 of Directive 2010/75/EU that BREFs should be updated no later than eight years after the publication of the previous version.
The timescales indicated above should be taken as representative of a typical ‘vertical’ BREF (see Section 1.1.2).
The exact steps and timing of the work for each BREF will depend on a number of factors, including the scope of the BREF (and the possible extension of the scope in the case of BREF reviews), the number and complexity of topics that need to be addressed, the resources of the EIPPCB (given its central role in the information exchange process) and, above all, the level of active and effective participation of the TWG. The flexibility that exists to adapt the workflow to the specifics of a particular BREF applies without prejudice to the overall objective to complete the work within the time limits indicated above.
It is expected that, in principle, two plenary TWG meetings will be held during the course of a BREF review (the kick-off meeting and the final meeting (see Section 4.6.2)). However, in certain exceptional cases (e.g. where a lot of new information has been provided, or when the determination of BAT is particularly controversial), an additional plenary TWG meeting may be held. In addition to these plenary TWG meetings, subgroup meetings can be organised to facilitate the work (see Section 4.4.3).
Also, it is expected that, in principle, one formal draft will be published before a final plenary TWG meeting (see Section 4.6.2.3), except in the case of a new BREF, or a particularly complex review, including, for example, a review with a major scope expansion, where a second formal draft is necessary. In addition to this (these) formal draft(s), working drafts may be distributed to facilitate the work (see Section 4.6.5).
In order to make the most efficient use of resources from all those involved in the drawing up or reviewing of a BREF, there needs to be a clear cut-off point for submission of the bulk of information promised or identified in the conclusions of the kick-off meeting (see Section 4.6.2.2). Information submitted after this deadline will be accepted only in exceptional circumstances, after consultation with the TWG, and will only be taken into account by the EIPPCB when it contributes substantially to deriving or updating conclusions on BAT.
Should it be necessary, the EIPPCB will submit requests for additional information (RAI) to the TWG in order to collect any important missing information that is considered necessary in particular for deriving BAT conclusions according to the guidance laid down in Chapters 3 and 5 (see Section 4.6.4).
NB: The timing between square brackets refers to cases when two formal drafts are distributed.
Step No | BREF review step |
Expected step time
(months)
Accumulated time
(months)
Comments
0 | Preparation for the review | | | After finalising a BREF, the EIPPCB maintains the BATIS forum for this BREF (see Section 4.7.1), in particular as regards follow-up actions to the recommendations for future work made in the BREF (see Section 2.3.10) and in view of the future review of the BREF. BATIS should serve as a forum for discussion and exchange of information in support of the next review process.
1 | TWG (re)activation and call for wishes | 2 | 2 | The EIPPCB (re)activates the TWG (calling for confirmation of membership and contact details). In the case of a BREF review, the EIPPCB asks TWG members to submit their wishes regarding information they would like to be considered during the review process or modifications/corrections they wish to see introduced into the existing text (see Section 4.6.1).
2 | Kick-off meeting | 3 | 5 |
In the case of a BREF review, the EIPPCB structures and establishes a consolidated list of wishes and, if necessary, develops standard templates for each issue on the wish list, for the TWG to provide information in a structured, efficient and directly usable way.
The EIPPCB calls a meeting (see Section 4.6.2.2) of the TWG in order to clarify the process, to discuss the wish list (in the case of a BREF review), to agree on the scope of the review and to agree on the data to be collected and its format based on the guidance on data collection provided for in Chapter 5.
The TWG agrees on a procedure based on general guidance of the EIPPCB to deal with issues like confidential business information, sensitive information under competition law, conflict of interests and other related matters.
3 | New information (deadline) | 6 | 11 |
The TWG collects and submits the information promised or identified in the conclusions of the kick-off meeting. Information readily available is submitted to the EIPPCB without delay so that drafting can start as soon as possible after the kick-off meeting.
During this period, the EIPPCB can:
participate in site visits, which might be agreed at or after the kick-off meeting (see Section 4.6.2.2),
research information,
start drafting using the available information submitted early.
The information submitted by members of the TWG and collected by the EIPPCB is shared with the TWG members in ‘real time’ via BATIS according to Sections 4.7.1 and 5.3. The TWG members can comment on the submitted information and share the comments through BATIS.
4 | Elaboration of the first formal draft | 4–6 | 15–17 |
The EIPPCB produces a first formal draft of the BREF (or of the revised parts of the BREF in the case of a BREF review) for formal consultation of the TWG (see Chapter 2 and Sections 4.6.5.1 and 4.6.6).
It is expected that the information submitted during the consultation period will normally provide the background needed to achieve a high degree of consensus on the chapters of the BREF entitled ‘Current emission and consumption levels’ (see Section 2.3.6) and ‘Techniques to consider in the determination of BAT’ (see Section 2.3.7), whereby the chapter of the BREF entitled ‘Best available techniques (BAT) conclusions’ (see Section 2.3.8) will be included in the first formal draft of a BREF review.
5 | TWG comments | 2–3 | 17–20 | The TWG comments on the draft are to be received within two months. When consultation is foreseen over the summer or year-end holidays then the period of consultation may be extended to three months maximum.
6 |
Elaboration of the second formal draft
(optional)
3–7 | [20–27] | The EIPPCB takes into account all the comments and the submitted information. The EIPPCB drafts a background document including an assessment of the major comments received and produces a second formal draft containing at least an updated version of the chapter of the BREF entitled ‘Best available techniques (BAT) conclusions and the latest version of the chapters of the BREF entitled ‘Current emission and consumption levels’ (see Section 2.3.6) and ‘Techniques to consider in the determination of BAT’ (see Section 2.3.7).
7 |
TWG comments
(optional)
2–3 | [22–30] | The second formal draft is issued for formal consultation for TWG comments to be received within two months. When consultation is foreseen over the summer or year-end holidays, the period of consultation may be extended to three months maximum.
8 | Final meeting | 3–5 |
20–25
[25–35]
The EIPPCB analyses all the comments and prepares for a final TWG meeting. The EIPPCB drafts a background paper including at least an assessment of the major comments received (see Section 4.6.6), and provides at least the latest version of the chapters of the BREF entitled ‘Current emission and consumption levels’ (see Section 2.3.6), ‘Techniques to consider in the determination of BAT’ (see Section 2.3.7) and ‘Best available techniques (BAT) conclusions’ (see Section 2.3.8).
This final TWG meeting seeks consensus for a final draft (see Section 4.6.2.3).
9 | Final draft | 4 |
24–29
[29–39]
The final draft is produced for a short commenting period to the TWG that should focus on the changes made as a result of the final meeting's conclusions. The EIPPCB ensures that feedback is given to the TWG on how these comments have been taken into account.
The updated final draft and the assessment of the final comments received are made available to the Forum at least eight weeks before the Forum meeting.
10 | Presentation at a Forum meeting | | |
The updated final draft is presented to the Forum, which is asked to provide its opinion on the document (see Section 1.3).
The Commission makes the opinion of the Forum publicly available.
In order to increase efficiency in the preparation of work, the EIPPCB will inform the Forum (see Section 4.3) as much in advance as is reasonably possible of the dates/periods a TWG is expected to be reactivated or set up. In the same way, the EIPPCB will inform TWG members of the next steps and possible deadlines.
Following the finalisation of the work within the TWG, the updated final draft of a BREF will be sent to the Forum established under Article 13 of Directive 2010/75/EU (see Section 4.3), which will be asked to provide its opinion on the document. The document will be discussed during a meeting of the Forum. Members of the Forum will be asked to submit all of their comments on the draft final version of the BREF in writing in advance of the meeting.
The Forum may address, inter alia:
issues raised in the TWG for which the split view of the TWG member concerned is not accurately reflected in the final draft text;
motivated proposals of Forum members to remove or modify a split view expressed by their own TWG representative;
clarification of text, which is unclear due to clumsy English language used in the final draft;
textual revisions that reflect more accurately the conclusion reached by the TWG;
corrections of typographic errors in the final draft;
proposals to bring important issues, which are already reported within the body of the BREF, to the ‘Concluding remarks and recommendations for future work’ section (see Section 2.3.10).
In accordance with Article 13(4) of Directive 2010/75/EU, the Commission shall make the opinion of the Forum on the proposed content of the BREF publicly available and will take it into account for the procedures for the adoption of decisions on the BAT conclusions and in the final published BREF.
The draft decision on the BAT conclusions (see Section 2.3.8 and Chapter 3) will be submitted by the Commission to the Committee established by Article 75(1) of Directive 2010/75/EU for delivering its opinion in accordance with the procedure referred to in Article 75(2) of Directive 2010/75/EU (see Section 4.2).