The limited amount of imports and their restricted availability for consumers means a broader definition of the geographic market is not possible. There are five sea terminals linked to the ARG+ which allow for ethylene imports by ship from production sites located outside the ARG+ area. Of total ethylene consumption by ARG+ consumers, approximately 15 % were imported from outside the ARG+ area in 2000, which was a peak year due to several unscheduled downtimes of ethylene production facilities (so-called "crackers") on the ARG. Usually imports account for approximately 10 % of total (captive and merchant) demand. By far the greatest share of imports is done by the owners of the import terminals, third-party imports only account for 10 to 20 % of the total imports. For third parties, the amount of ethylene imports into the ARG+ catchment area is severely restricted. First, there are no public terminals offering free access to third parties, but all are owned by ethylene producers. Second, existing terminals have been designed primarily to fit the ethylene needs of their owners, they are in addition to imports used for the storage of excess production of the cracker usually linked to the terminal, and do not provide sufficient long-term capacity for the open market. Even if third parties are allowed to use these terminals, third parties raised a number of contractual and practical difficulties which prevent them from using these terminals on a structural basis. In contractual terms, it appears to be very common that terminalling contracts are linked to the existence and duration of a supply agreement with the terminal owner and that the terminal is only made available for a certain percentage of the volumes which are supplied directly by the terminal owner. In addition, such contracts partly provide for certain rights of the terminal owners whereby the ethylene purchaser is obliged to negotiate with the terminal owner whether the purchaser would accept direct supply instead of using the terminal. Third, consumers which are not directly linked to a sea terminal have to pay ship freight cost, terminalling fees and transportation costs charged by the ARG for transport over the pipeline, which means that large scale imports are not an economically viable alternative to product produced on the ARG+.
Recital 18, Decision_act (EU) 2003/26
In forcesince 20 Dec 2001