Art. 5 Decision_act (EU) 2002/29

In forcesince 8 Jan 2002
1.

To meet the objectives of Article 4, the Commission shall conclude a contract with Merial SAS without delay.

2.

The Director-General of the Directorate-General for Health and Consumer Protection shall be authorised to sign the contract on behalf of the European Commission.