Austria has provided the following evidence:

(a)

a detailed model calculation carried out by a renowned energy provider, showing that the prices for basic process media agreed with WHS are higher than if LLG had, with the help of this energy provider, built the utility centre itself. According to this calculation, WHS charges LLG prices that are about 5 % higher than would have been the costs of self provision;

(b)

WHS operates an up-to-date energy-efficient combined heat and power plant whose costs in general compare rather favourably with other energy and process media providers. As in such a plant different media are simultaneously generated, it is not easily possible to compare prices for individual media with those of other providers. Prices can, however, be compared with a comparable media centre at Lenzing AG, the parent company of LLG. Internal calculations show that the same mix of media would be available at considerably lower costs at the main location at Lenzing, outside Burgenland;

(c)

comparisons with other waste-water treatment plants showed that the waste-water treatment price of EUR 0,5 per m3 represents a normal market price. Austria also demonstrated that full costs of the treatment plant, including full depreciation for investments, would be less than EUR 0,4 per m3. The price structure can be regarded as normal in the waste-water sector. In addition to these cost-covering prices and so as to remove any remaining doubts on possible state aid, Austria confirmed in writing that LLG was now prepared to pay a further EUR 0,3 million in connection costs for surface water drainage;

(d)

on 25 February 2000 LLG declared in writing that it was waiving all price guarantees for all basic process media. This removed any aid element that might be inherent in the 30 year price guarantee as stipulated in the "Burgenland Vertrag". LLG paid the market prices referred to above already before the date of this waiver.