Recital 51, Decision_act (EU) 1998/190

In forcesince 14 Jan 1998

Cranfield finally noted that particular attention should be paid to the core of Terminal 1 (namely the whole of the terminal with the exception of the link with Terminal 2 and of the north of pier A), where the roadway system is constrained (and congested), because of the terminal design. The presence of a second handler with a small market share in the portion of Terminal 1 where non-Lufthansa flights are handled (particularly in the cul-de-sac formed by the eastern edge of pier B and pier C) would give rise to equipment movement which could block the roadway system.

D.4. Minimum connection time (MCT)