Art. 3 Free trade Agreement between the European Union and its Member States, of the one part,…

Conformity assessment procedure

In forcesince 1 Jan 2023

In case a Party requires a positive assurance of conformity with technical regulations on EMC or safety of covered products, the following rules shall apply [Either Party reserves its right to require in the future positive assurance of conformity for any product currently not subject to positive assurance of conformity, in which case the Party has to comply with its obligations under this Annex.]:

(a)

conformity assessment procedures shall not be prepared, adopted or applied with a view to or with the effect of creating unnecessary obstacles to trade with the other Party;

(b)

except as otherwise provided under this Annex, including the transitional arrangements set out in Article 4, each Party shall accept products on its market [The permission to place a product on the market in accordance with this subparagraph shall include permission to affix any mandatory marks that are required for placing such product on the market.] on the basis of one or more of the following procedures as positive assurance of conformity to its technical regulations on EMC or safety of covered products:

(i)

a supplier’s declaration of conformity without requiring the intervention of any conformity assessment body or testing of the product by recognised testing laboratories;

(ii)

a supplier’s declaration of conformity based on a test report from any testing laboratory in the other Party’s territory that has been notified by the Party at the entry into force of this Agreement or in any subsequent notifications. The notifying Party shall be solely responsible for notifying any laboratory which is competent [The specific testing laboratories that are competent in the notifying Party in accordance with its legislation, that obtain accreditation (for example under ISO/IEC 17025) by the accreditation body or that are competent for post-market surveillance for conformity assessment in the notifying Party, will be considered competent for the task envisaged in this Annex.] to perform the relevant tests in its territory, without prior approval or verification by the importing Party. The importing Party may require that the declaration of conformity is submitted by the supplier before the product is placed on its market and that the declaration contains the name of the testing laboratory issuing the test report and the issuing date of the test report. The importing Party may also require a copy of the test report, including a list of critical components, demonstrating conformity to the requirements applicable to the product, and a general description of the product; or

(iii)

a supplier’s declaration of conformity based on a test report issued by:

(A) any testing laboratory in the other Party that has concluded voluntary arrangements for mutual acceptance of test reports with one or more conformity assessment bodies designated by the importing Party; or

(B) a CB Test Laboratory of the other Party under the IECEE CB Scheme, accompanied by a valid CB Test Certificate, in accordance with the rules and procedures of the IECEE CB Scheme and the commitments by the Parties thereunder.

The importing Party may require for review before the product is placed on its market the submission of the declaration of conformity which contains a copy of the test report, including a list of critical components, demonstrating conformity to the requirements applicable to the product, and a general description of the product.

The choice among the procedures in this subparagraph shall rest with each Party subject to the limitations set out in Appendix 2-B-2;

(c)

the Parties shall accept the supplier as solely responsible for issuing, changing or withdrawing the declaration of conformity. The Parties may require that the declaration of conformity is dated and identifies the supplier or the supplier’s authorised representative in their territories, the person empowered by the manufacturer or his authorised representative to sign the declaration, the products covered by the declaration, and the applied technical regulations to which conformity is declared. When a supplier’s declaration of conformity is for a batch of products, it shall cover each article of the batch. When testing is undertaken, the choice of the testing laboratory shall rest with the supplier; and

(d)

beyond what is set out in this Article, a Party shall not require any form of registration of products that may prevent or otherwise delay the placing on the market of products that comply with the Party’s technical regulations. In so far as a Party reviews the supplier’s declaration in line with subparagraph (b)(iii), the review shall be solely limited to verifying, on the basis of the documentation submitted, that the test has been done in accordance with the Party’s relevant technical regulations and that the information contained in the documentation is complete. Any such review shall not cause undue delay for the placing of the products on the Party’s market and the declaration shall be accepted, without exceptions, if the products comply with the Party’s technical regulations and the documentation submitted is complete. In the event that a declaration is rejected, the Party shall communicate its decision to the supplier immediately, together with a detailed explanation of the grounds for the rejection and how these can be rectified by the supplier, as well as an explanation of possibilities to appeal the decision.