The Building (Higher-Risk Buildings Procedures) (Wales) Regulations 2025, 8

Building control authority’s power to require notifications etc. for HRB work or stage of HRB work

In forcesince 12 Dec 2025cited 1×
(1)

The building control authority may, by notice in writing, require a client—

(a)

to notify the building control authority, within a specified period, when a specified point of the HRB work or a specified point of the stage of HRB work has been reached;

(b)

not to cover up specified work for a specified period.

(2)

In this regulation, “specified” means specified by the building control authority in the notice referred to in paragraph (1).