The Building (Higher-Risk Buildings Procedures) (Wales) Regulations 2025, 45

Inspections etc.

In forcesince 12 Dec 2025

The building control authority for any building or proposed building in relation to that building or proposed building may take such steps as it considers appropriate to check compliance with all applicable requirements of the building regulations, including—

(a)

requiring information;

(b)

requiring the laying open of building work for inspection by the building control authority;

(c)

requiring an inspection to be undertaken and the record of the inspection provided.