(1)
Location
(2)
Plot reference number(s) shown on Land Plans
(3)
Purpose for which temporary possession may be taken
(4)
Relevant part of the authorised development
Land Plans - Sheet 2
Section 1. District of West Berkshire | 02–16, 02–17, 02–18 |
At railway level: temporary land required for access for inspection and possible refurbishment of bridge
| 1a, 1b, 2a, 2b
Section 1. District of West Berkshire | 02–02a, 02–05 |
Land within existing highway boundary used for access to Scheme construction site and construction compound including traffic management
| All works within Schedule 1
Section 1. District of West Berkshire | 02–20, 02–20a, 02–20b, 02–22, 02–22a, 02–22b, 02–23, 02–23a, 02–23b, 02–25, 02–25a, 02–25b |
At river and river bank level: temporary use for inspection and possible refurbishment of bridge
| 1a, 1b
Section 1. District of West Berkshire | 02–08, 02–12 |
Temporary land required for use as construction compound
| All works within Schedule 1
Section 1. District of West Berkshire | 02–09, 02–10, 02–11 |
Temporary land required for use for access to construction compound
| All works within Schedule 1
Land Plans - Sheet 3
Section 1. District of West Berkshire | 03–07, 03–12 |
Temporary use for improvement and realignment of sliproads including traffic management and cross carriageway ducting
| 3a, 3b, 3c, 3d
Land Plans - Sheet 4
Section 1. District of West Berkshire | 04–06, 04–08, 04–10 |
At railway level: temporary land required for access for inspection and possible refurbishment of bridge
| 1a, 1b
Section 1. District of West Berkshire | 04–03, 04–04 |
Temporary use for inspection and possible refurbishment of culvert
| 1a, 1b
Land Plans - Sheet 6
Section 3. Borough of Reading | 06–03, 06–04, 06–05, 06–08 |
Temporary traffic management and for access to Scheme construction site
| All works within Schedule 1
Section 3. Borough of Reading | 06–10, 06–10a, 06–12, 06–12a, 06–12b |
Temporary traffic management, including lane restrictions, to create working space for construction of the Scheme including a gantry Type 1 and realignment of Junction 11 Eastbound on slip
| 1a, 4b
Section 2. Borough of Wokingham | 06–09b, 06–10b, 06–13, 06–14, 06–14a, 06–14b, 06–20 |
Temporary traffic management, including lane restrictions, to create working space for construction of the Scheme including a gantry Type 1 and realignment of Junction 11 Eastbound on slip
| 1a, 4b
Land Plans - Sheet 7
Section 2. Borough of Wokingham | 07–04, 07–05, 07–06, 07–08 |
Temporary use to create working space for construction of improved access to Cutbush Lane transmission station
| 1a
Section 2. Borough of Wokingham | 07–11 |
Temporary use to create working space for removal of existing police observation platform
| 1a
Land Plans - Sheet 10
Section 2. Borough of Wokingham | 10–07, 10–08, 10–09 |
At railway level: temporary use for inspection and possible refurbishment of bridge
| 1a, 1b, 5a
Land Plans - Sheet 17
Section 4. Royal Borough of Windsor and Maidenhead | 17–12 |
Temporary use as construction compound
| All works within Schedule 1
Land Plans - Sheet 18
Section 4. Royal Borough of Windsor and Maidenhead | 18–02, 18–03 |
Temporary use as construction compound
| All works within Schedule 1
Section 4. Royal Borough of Windsor and Maidenhead | 18–07, 18–08 | Temporary land required for access and working space to construct realigned Ascot Road and new Ascot Road overbridge including retaining wall to east side of Ascot Road | 7a, 7b
Section 4. Royal Borough of Windsor and Maidenhead | 18–09, 18–10, 18–17, 18–17a, 18–17b, 18–19 |
Temporary land required for access and working space to construct realigned Ascot Road and new Ascot Road overbridge
| 7a
Land Plans - Sheet 19
Section 4. Royal Borough of Windsor and Maidenhead | 19–19, 19–19b, 19–20, 19–20a, 19–25, 19–27, 19–28a, 19–30, 19–30a, 19–33, 19–33a |
At river and river bank level: temporary land required for widening Thames Bray underbridge
| 1a, 1b, 9a, 9b
Section 6. County of Buckinghamshire, District of South Bucks | 19–35, 19–35a, 19–37, 19–37a, 19–38, 19–39 |
At river and river bank level: temporary land required for widening Thames Bray underbridge
| 1a, 1b, 9a, 9b
Section 4. Royal Borough of Windsor and Maidenhead | 19-02, 19-02a, 19-02b, 19-06, 19-10 |
Temporary land required for access and working space for online reconstruction of Monkey Island Lane and Monkey Island Lane overbridge
| 8c
Section 4. Royal Borough of Windsor and Maidenhead | 19–11, 19-14 |
Temporary land required for access and working space for online reconstruction of Monkey Island Lane and Monkey Island Lane overbridge and for widening of Thames Bray underbridge, including widening of the M4 and M4 embankment
| 8a, 8b, 8c, 9b
Section 6. County of Buckinghamshire, District of South Bucks | 19-34, 19-36, 19-40, 19-41, 19-45, 19-46, 19-47, 19-49, 19-51, 19-53, 19-54, 19-55 |
Temporary land for access and working space for widening of Thames Bray underbridge to the North, including widening of the M4 and M4 embankment
| 9a, 9b
Section 4. Royal Borough of Windsor and Maidenhead | 19-11a, 19-14a, 19-16, 19-18, 19-28, 19-29, 19-21, 19-22, 19-23, 19-24, 19-26, 19-31, 19-32 |
Temporary land for access and working space for widening of Thames Bray underbridge to the North, including widening of the M4 and M4 embankment
| 8a, 8b, 9a, 9b
Section 6. County of Buckinghamshire, District of South Bucks | 19–56, 19–57, 19–57a |
Temporary land for access and working space for widening the M4 and M4 embankment
| 10b
Section 6. County of Buckinghamshire, District of South Bucks | 19-58, 19–59, 19–61, 19–62, 19–65, 19–73, 19–75, 19–76, 19–77, 19–79 |
Temporary land required for access and working space for online reconstruction of Marsh Lane and Marsh Lane overbridge
| 10c
Section 6. County of Buckinghamshire, District of South Bucks | 19–80 |
At river level: temporary land required for access for inspection and possible refurbishment work to Jubilee River Bridge
| 1a, 1b
Land Plans - Sheet 20
Section 6. County of Buckinghamshire, District of South Bucks | 20–02, 20–03, 20–03a, 20–07, 20–08, 20–09, 20–10, 20–12, 20–17, 20–20 |
Temporary land required for access and working space to construct realigned Lake End Road and new Lake End Road overbridge
| 11a, 11b, 11c
Section 7. Borough of Slough | 20–27, 20–28 |
Temporary land required for access and working space to construct realigned Huntercombe Spur and new Huntercombe Spur overbridge
| 12b, 12e, 12f
Section 6. County of Buckinghamshire, District of South Bucks | 20–22, |
Temporary land required for access and working space to construct realigned Huntercombe Spur and new Huntercombe Spur overbridge
| 12b, 12c, 12d, 12e
Section 7. Borough of Slough | 20–30, 20–31, 20–32, 20–32a, 20–33, 20–34, 20–35, 20–36, 20–37, 20–37a, 20–37b, 20–37c, 20–38, 20–41b, 20–41c |
Temporary land required for access and working space for online reconstruction of Oldway Lane and Oldway Lane overbridge
| 13, 13b, 13c
Section 7. Borough of Slough | 20–41, 20–41a |
Temporary land required to enable temporary diversion of Rights of Way between Oldway Lane and Wood Lane
| 13c, 14c
Land Plans - Sheet 21
Section 7. Borough of Slough | 21–01, 21–02, 21–02a |
Temporary land required to enable temporary diversion of Rights of Way between Oldway Lane and Wood Lane
| 13c, 14c
Section 7. Borough of Slough | 21–02b, 21–02c |
Temporary land required to enable temporary diversion of Rights of Way between Oldway Lane and Wood Lane and for access and working space to construct and realign Wood Lane and new Wood Lane overbridge
| 13a, 13c, 14a, 14c
Section 7. Borough of Slough | 21–02d, 21–04, 21–05, 21–06, 21–07, 21–12a, 21–13, 21–14, 21–15, 21–16, 21–17, 21–18 |
Temporary land required for access and working space to construct realigned Wood Lane and new Wood Lane overbridge
| 14a, 14b, 14c
Section 7. Borough of Slough | 21–20, 21–21 |
Temporary land required for access and working space for the extension of Chalvey Culvert
| 15
Land Plans - Sheet 22
Section 7. Borough of Slough | 22–22, 22–23, 22–24, 22–25 |
At railway level: temporary land required for access and working space for widening Windsor Branch railway underbridge to the South, including realignment of M4 and Junction 6 Westbound off-slip and embankment strengthening and widening
| 1a, 1b, 16b, 16c, 17
Section 7. Borough of Slough | 22–01 |
Temporary access for inspection and possible refurbishment of culvert
| 1a, 1b
Section 4. Royal Borough of Windsor and Maidenhead
| 22–10 | Temporary use for access to construction compound | All works within Schedule 1
Section 7. Borough of Slough | 22–09 |
Temporary use for access to construction compound and to Scheme construction site
| All works within Schedule 1
Section 4. Royal Borough of Windsor and Maidenhead | 22–11 |
Temporary use as construction compound
| All works within Schedule 1
Section 7. Borough of Slough | 22–12, 22–26 |
Temporary land required for access and working space for widening Windsor Branch Railway underbridge to the South, including realignment of M4 and Junction 6 Westbound off-slip and embankment strengthening and widening
| 1b, 16c, 17
Section 7. Borough of Slough | 22–18, 22–21 |
Temporary land required for access and working space for widening Windsor Branch Railway underbridge to the South, including realignment of M4 and Junction 6 Eastbound on-slip
| 1a, 16b, 17
Land Plans - Sheet 23
Section 7. Borough of Slough | 23–02, 23–03, 23–04 |
Temporary land for access and working space to extend Water Main and Gas Main subway
| 18
Section 4. Royal Borough of Windsor and Maidenhead | 23–12 |
Temporary land required for access and working space to construct realigned Datchet Road and new Datchet Road overbridge
| 19a, 19c
Section 7. Borough of Slough | 23–11 |
Temporary land required for access and working space to construct realigned Datchet Road and new Datchet Road overbridge
| 19a, 19c
Section 7. Borough of Slough | 23–07, 23–08 |
Temporary land for possible realignment of private means of access to Datchet Road
| 19c
Section 4. Royal Borough of Windsor and Maidenhead | 23–32 |
Temporary land required for access and working space for online reconstruction of Recreation Ground overbridge
| 20a, 20c
Section 7. Borough of Slough | 23–33 |
Temporary land required for access to finishing works on Recreation Ground road and Recreation Ground overbridge
| 20c
Section 4. Royal Borough of Windsor and Maidenhead | 23–34, 23–35 |
Temporary land required for access and working space to extend Water Main subway
| 21
Section 4. Royal Borough of Windsor and Maidenhead | 23–29 |
Temporary use as construction compound and temporary land required for access and working space to construct realigned Datchet Road and new Datchet Road overbridge, and temporary land required for access and working space for online reconstruction of Recreation Ground overbridge
| 19c, 20c, All works within Schedule 1
Section 7. Borough of Slough | 23–19 |
Temporary use as construction compound and temporary land required for access and working space to construct realigned Datchet Road and new Datchet Road overbridge
| 19c, All works within Schedule 1
Land Plans - Sheet 24
Section 4. Royal Borough of Windsor and Maidenhead |
24-02, 24-03, 24-04, 24-05, 24-06, 24-07, 24-08, 24-09, 24-10, 24-11, 24-12, 24-13, 24-14, 24-15, 24-16, 24-17, 24-18, 24-20, 24-21, 24-22, 24-23, 24-24, 24-25, 24-29, 24-30, 24-32, 24-33, 24-34a
| Temporary land required for access and working space to construct realigned Riding Court Road and new Riding Court Road overbridge | 22a, 22b, 22c
Section 4. Royal Borough of Windsor and Maidenhead | 24-34, 24-36, 24-40 |
Temporary traffic management, including lane restrictions on Riding Court Road, to create working space for construction of the Scheme
| 1a, 23a, 23b
Section 4. Royal Borough of Windsor and Maidenhead | 24-37, 24-38 |
Temporary traffic management, including lane restrictions on Majors Farm Road, to create working space for construction of the Scheme
| 1b
Land Plans - Sheet 25
Section 4. Royal Borough of Windsor and Maidenhead | 25-01, 25-02 |
Temporary traffic management, including lane restrictions on Riding Court Road, to create working space for construction of the Scheme
| 1a, 24a
Section 7. Borough of Slough | 25-03, 25-06, 25-09 |
Temporary traffic management, including lane restrictions on Riding Court Road, to create working space for construction of the Scheme
| 1a, 24a
Section 4. Royal Borough of Windsor and Maidenhead | 25-11 |
Temporary traffic management, including lane restrictions on Majors Farm Road, to create working space for construction of the Scheme
| 1b, 24d
Section 7. Borough of Slough | 25-15, 25-19 |
Temporary traffic management, including lane restrictions on Majors Farm Road, to create working space for construction of the Scheme
| 1b, 24d
Section 7. Borough of Slough | 25-20, 25-22 |
Temporary traffic management and access to Scheme construction site
| All works within Schedule 1
Section 7. Borough of Slough | 25-30, 25-31, 25-32, 25-33, 25-34 |
Temporary use as construction compound
| All works within Schedule 1
Land Plans - Sheet 26
Section 7. Borough of Slough | 26-03, 26-06, 26-09, 26-10, 26-19 |
Temporary land required for access and working space for online reconstruction of Old Slade Lane and Old Slade Lane overbridge
| 25, 26a, 26b
Section 6. County of Buckinghamshire, District of South Bucks | 26-02, 26-18 |
Temporary land required for access and working space for online reconstruction of Old Slade Lane and Old Slade Lane overbridge
| 25, 26a
Section 7. Borough of Slough | 26-09a, 26-10a, 26-11, 26-12, 26-13 |
Possible temporary access or diversion route for Old Slade Lane
| 25
Land Plans - Sheet 27
Section 6. County of Buckinghamshire, District of South Buckinghamshire | 27-12a, 27-12b, 27-12c, 27-12d, 27-12e, 27-12f |
At motorway level; land within existing motorway boundaries retained for construction and operation of the Scheme. At railway level: temporary access for inspection and possible refurbishment of the bridge.
| 1a, 1b, 27a, 27b
Section 7, Borough of Slough | 27-13a, 27-13b, 27-13c, 27-13d |
At motorway level; land within existing motorway boundaries retained for construction and operation of the Scheme. At railway level: temporary access for inspection and possible refurbishment of the bridge.
| 1a, 1b, 26a, 26b
Land Plans - Sheet 28
Section 8. London Borough of Hillingdon | 28-04, 28-05, 28-06, 28-07, 28-09, 28-10, 28-11, 28-12 |
Temporary access and working space for extension of Sipson Road subway
| 28, 29a, 29d
Land Plans - Sheet 29
Section 8. London Borough of Hillingdon | 29-01, 29-02, 29-03 |
Temporary use as construction compound
| All works within Schedule 1
Land Plans - Sheet 30
Section 8. London Borough of Hillingdon | 30-03 | For inspection and possible refurbishment to St Dunstans Subway | 1a,1b