Before placing a lift on the market, an installer must—
have a relevant conformity assessment procedure carried out; and
draw up the technical documentation referred to—
for a lift in respect of which the conformity assessment procedure in regulation 47(1)(a) is being carried out, in point 3 of Part B of Module B in Schedule 11;
for a lift in respect of which the conformity assessment procedure in regulation 47(1)(b) or 47(1)(d) is being carried out, in point 3.1(d) of Module H1 in Schedule 18;
for a lift in respect of which the conformity assessment procedure in regulation 47(1)(c) is being carried out, in point 3 of Module G in Schedule 15.