The Cableway Installations Regulations 2004 (revoked), 4
Cableway installations–duties on the main contractor
Changed on 30 Jul 2018
(1) The main contractor shall not carry out or permit to be carried out works for the construction or modification of a cableway installation unless he has obtained a stage 1 authorisation under regulation 13(1) in respect of that cableway installation.
(2) Before making an application for a stage 1 authorisation in relation to the construction or modification of a cableway installation the main contractor shall ensure that:—
(a) a safety analysis is undertaken; and
(b) a safety report is prepared.
(3) The main contractor shall ensure, in relation to the construction or modification of a cableway installation that—
(a) that installation complies with—
(i) any relevant measures specified in the safety report,
(ii) special conditions (if any) imposed by the Executive under regulation 17(8), and
(iii) conditions imposed (if any) by the Secretary of State under regulation 19(3) with the stage 1 authorisation;
(b) that installation complies with such of the essential requirements as relate to that type of installation;
(c) a technical file has been compiled which contains—
(i) the safety analysis;
(ii) the safety report; and
(iii) the declarations of conformity and the accompanying technical documentation relating to any safety component or subsystem which forms a part of the cableway installation.
(4) In relation to the modification of a cableway installation, references in this regulation to “safety analysis”, “safety report”, “technical file” and “essential requirements” shall be construed as applying only to the modification of the cableway installation and its repercussions on the installation as a whole.…
- 30 Jul 2018 – todayin force
- 28 Jan 2004 – 30 Jul 2018earlier wording