PCPA 2004, s. 15bb

Minerals and waste plan timetable

In forcesince 3 Mar 2026cited 2×
(1)

Each minerals and waste planning authority must prepare and maintain a document to be known as their “minerals and waste plan timetable”.

(2)

The minerals and waste plan timetable must specify—

(a)

the matters which will be dealt with by the minerals and waste plan for the relevant area,

(b)

the geographical area to which the authority’s minerals and waste plan is to relate,

(c)

any supplementary plans which the minerals and waste planning authority are to make,

(d)

the subject matter and geographical area, site or sites to which each supplementary plan is to relate,

(e)

whether the minerals and waste plan for the authority’s area is to be a joint minerals and waste plan and, if so, each other minerals and waste planning authority for whose relevant area the joint minerals and waste plan is to be the minerals and waste plan,

(f)

whether the authority are to prepare a joint supplementary plan and, if so, each other minerals and waste planning authority who are to prepare that joint supplementary plan with them, and

(g)

a timetable for the preparation of the minerals and waste plan for the relevant area, and any supplementary plans the authority are to make, which is consistent with this Part and any regulations made under it.

(3)

If the minerals and waste plan for the relevant area is to be a joint minerals and waste plan, or the authority is to prepare one or more joint supplementary plans, the timetable for each joint plan, specified in the minerals and waste plan timetable in accordance with subsection (2)(g), must be consistent with the timetable for that plan in the minerals and waste plan timetable prepared by each other minerals and waste planning authority who are to prepare that plan.

(4)

Sections 15B(5) to (12), 15BA and 15LE apply in relation to a minerals and waste plan timetable as they apply in relation to a local plan timetable and for that purpose—

(a)

references to a local plan timetable are to be read as references to a minerals and waste plan timetable,

(b)

references to a local plan are to be read as references to a minerals and waste plan,

(c)

references to a local planning authority are to be read as references to a minerals and waste planning authority, and

(d)

references to a local planning authority’s area are to be read as references to a minerals and waste planning authority’s relevant area.

(5)

In this section “joint minerals and waste plan” means a minerals and waste plan prepared jointly by two or more minerals and waste planning authorities for their combined relevant areas under sections 15I and 15IA (as applied by section 15CB(8)).

  • The Town and Country Planning (Local Planning) (England) Regulations 202646Law

    … plan timetable, including whether the authority has published a timetable which complies with the requirements in sections 15B and 15BB of the Act and Part 2 of these Regulations, (b) the minerals and waste planning authority’s project …

  • The Planning Data (England) Regulations 20261Law

    In this Schedule— “minerals and waste plan timetable” must be construed in accordance with section 15BB of the PCPA 2004; “minerals and waste planning authority” must be construed in accordance with section 15LG of the PCPA 2004.