Date | Depth of water flowing over waste weir or overflow (in metres) | Name, position and signature of engineer or other person responsible for the entry
Details of any action taken by SEPA under section 71 of the Act: | Date(s) when action taken:
Date | Depth of water flowing over waste weir or overflow (in metres) | Name, position and signature of engineer or other person responsible for the entry
Details of any action taken by SEPA under section 71 of the Act: | Date(s) when action taken: