…
The Pollution Prevention and Control (Scotland) Regulations 2012 (revoked), 45
Permits: proposed change in operation
Changed on 1 Nov 2025
(1) An operator of an installation or mobile plant in respect of which a permit is granted must give notice to SEPA of a proposed change in operation (a “change notice”) at least 14 days before making the change.
(2) A change notice must—
(a) be in writing, and
(b) contain a description of the proposed change in operation.
(3) SEPA must acknowledge receipt of a change notice.
(4) A change notice is not necessary if—
(a) the operator applies for a variation of the permit before a change in operation is made, and
(b) that application describes the proposed change.
(5) An operator must not make a change during any period beginning with the date of service on the operator of a notice under regulation 63(2) and ending on the date on which the operator provides the required information.…
- 1 Nov 2025 – todayin force
- 20 Dec 2012 – 1 Nov 2025earlier wording