Schedule 2 SUBSTITUTION OF TABLE D IN PART 2 OF SCHEDULE 2 TO THE PRINCIPAL REGULATIONS, The Rural Development Contracts (Rural Priorities) (Scotland) Amendment Regulations 2011…
Changed on 12 Jun 2015
Table D
Standard Costs for Forestry Operations/Capital Items
Column 1 | Column 2
Item | Standard Cost
Fell/extract dangerous trees | £200 per tree
Manual brashing | £0.35 per tree
High pruning | £1.30 per tree
Badger gates installed in fence lines which are cutting across an established badger run | £110 per gate
Respace natural regeneration | £600 per hectare
Early pruning of trees | £375 per hectare
High pruning of trees | £660 per hectare
Woodland thinning | £520 per hectare
Removal of tree crop to waste 3-6 metres high | £1,100 per hectare
Woodland clearance - felling of waste | £975 per hectare
Woodland clearance - felling and extraction | £1375 per hectare
Seedling tree removal | £35 per hectare
Chipping/mulching of tree debris and brash | £500 per hectare
Restructuring with Caledonian Scots pine | £411.64 per hectare
Restructuring with diverse conifers | £411.64 per hectare
Restructuring with mixed broadleaves | £1,030.14 per hectare
Restructuring with native broadleaves | £1,100 per hectare
Restructuring with mixed conifer and broadleaves | £595.89 per hectare
Woodland deer impact reduction | £30 per hectare for deer control during the first 5 years of a Deer Management Plan
Forest plan preparation | £20 per hectare for first 200 hectares, £5 per hectare thereafter with a minimum payment of £400 and a maximum payment of £15,000
Dead wood management | £40 per hectare
Stock fence | £4 per metre
Enhancing/modifying a stock fence in black grouse and capercaillie core areas | £2 per metre
New deer fence | £7.25 per metre
Upgrading stock to deer fence | £2.75 per metre
Scare or temporary fencing | £1.50 per metre
Rabbit proofing – existing or new stock/deer fence | £1.90 per metre
Enhancing/modifying a deer fence in black grouse and capercaillie core areas | £5 per metre
Conversion of deer fence to stock fence in black grouse and capercaillie core areas | £2 per metre
Fence removal | £2 per metre
Gate for stock fence | £100 each
Gate for deer fence | £170 each
Ditch/drain blocking with plastic piling dams: Small ditches (up to 0.5 metres wide and deep) | £60 per dam
Ditch/drain blocking with plastic piling dams: Medium ditches (between 0.5 and 1 metre wide and deep) | £120 per dam
Ditch/drain blocking with plastic piling dams: Large ditches (between 1 and 2 metres wide and 0.5 and 1 metre deep) | £280 per dam
Peat dam | £0.26 per metre of drain or furrow blocked with peat dams. Minimum payment £300
Small scale tree and shrub planting (on a site not exceeding 0.25 hectares) | £2 per tree or shrub
Provision of bat and bird boxes | £15 per box
Primary treatment of bracken | £200/hectare of infested land
Eradication of scrub/woody vegetation: Light vegetation | £600/hectare
Eradication of scrub/woody vegetation: Intermediate vegetation | £850/hectare
Eradication of scrub/woody vegetation: Heavy vegetation | £1250/hectare
Removal from site of the cut shrub/woody vegetation: Light vegetation | £500/hectare
Removal from site of the cut shrub/woody vegetation: Intermediate vegetation | £1050/hectare
Removal from site of the cut shrub/woody vegetation: Heavy vegetation | £1450/hectare
Provision of water troughs to replace traditional watering points | £195 each
Installation of water supply pipe to water trough or pasture pump | £3 per metre of pipe laid
Water trough pump: cattle operated pasture or nose pump | £180 per installed pump
Stock bridge for bog management:
Small bridge
Large bridge (for ditch wider than 1.5 metres)
£170 per bridge
£620 per bridge
Heather management (in black grouse and Capercaillie core areas) | £250/hectare
Manual eradication of rhododendron:
Light infestation/easy access
Medium infestation/access
Difficult access
£4,500 per hectare of infested land
£6,100 per hectare of infested land
£9,500 per hectare of infested land
Mechanised eradication of rhododendron:
Light infestation/easy access
Medium infestation/access
Difficult access
£1,800 per hectare of infested land
£2,400 per hectare of infested land
£2,900 per hectare of infested land
Chemical eradication of rhododendron by foliar or stem injection | £1,500 per hectare of infested land
Self-closing/kissing gate for non-vehicular access | £350 each
Stile | £55 each
Building/restoring drystane or flagstone dykes | £17.50 per square metre…