Schedule 2 SUBSTITUTION OF TABLE D IN PART 2 OF SCHEDULE 2 TO THE PRINCIPAL REGULATIONS, The Rural Development Contracts (Rural Priorities) (Scotland) Amendment Regulations 2011…

In forcesince 12 Jun 2015

…

Changed on 12 Jun 2015

Table D Standard Costs for Forestry Operations/Capital Items Column 1 | Column 2 Item | Standard Cost Fell/extract dangerous trees | £200 per tree Manual brashing | £0.35 per tree High pruning | £1.30 per tree Badger gates installed in fence lines which are cutting across an established badger run | £110 per gate Respace natural regeneration | £600 per hectare Early pruning of trees | £375 per hectare High pruning of trees | £660 per hectare Woodland thinning | £520 per hectare Removal of tree crop to waste 3-6 metres high | £1,100 per hectare Woodland clearance - felling of waste | £975 per hectare Woodland clearance - felling and extraction | £1375 per hectare Seedling tree removal | £35 per hectare Chipping/mulching of tree debris and brash | £500 per hectare Restructuring with Caledonian Scots pine | £411.64 per hectare Restructuring with diverse conifers | £411.64 per hectare Restructuring with mixed broadleaves | £1,030.14 per hectare Restructuring with native broadleaves | £1,100 per hectare Restructuring with mixed conifer and broadleaves | £595.89 per hectare Woodland deer impact reduction | £30 per hectare for deer control during the first 5 years of a Deer Management Plan Forest plan preparation | £20 per hectare for first 200 hectares, £5 per hectare thereafter with a minimum payment of £400 and a maximum payment of £15,000 Dead wood management | £40 per hectare Stock fence | £4 per metre Enhancing/modifying a stock fence in black grouse and capercaillie core areas | £2 per metre New deer fence | £7.25 per metre Upgrading stock to deer fence | £2.75 per metre Scare or temporary fencing | £1.50 per metre Rabbit proofing – existing or new stock/deer fence | £1.90 per metre Enhancing/modifying a deer fence in black grouse and capercaillie core areas | £5 per metre Conversion of deer fence to stock fence in black grouse and capercaillie core areas | £2 per metre Fence removal | £2 per metre Gate for stock fence | £100 each Gate for deer fence | £170 each Ditch/drain blocking with plastic piling dams: Small ditches (up to 0.5 metres wide and deep) | £60 per dam Ditch/drain blocking with plastic piling dams: Medium ditches (between 0.5 and 1 metre wide and deep) | £120 per dam Ditch/drain blocking with plastic piling dams: Large ditches (between 1 and 2 metres wide and 0.5 and 1 metre deep) | £280 per dam Peat dam | £0.26 per metre of drain or furrow blocked with peat dams. Minimum payment £300 Small scale tree and shrub planting (on a site not exceeding 0.25 hectares) | £2 per tree or shrub Provision of bat and bird boxes | £15 per box Primary treatment of bracken | £200/hectare of infested land Eradication of scrub/woody vegetation: Light vegetation | £600/hectare Eradication of scrub/woody vegetation: Intermediate vegetation | £850/hectare Eradication of scrub/woody vegetation: Heavy vegetation | £1250/hectare Removal from site of the cut shrub/woody vegetation: Light vegetation | £500/hectare Removal from site of the cut shrub/woody vegetation: Intermediate vegetation | £1050/hectare Removal from site of the cut shrub/woody vegetation: Heavy vegetation | £1450/hectare Provision of water troughs to replace traditional watering points | £195 each Installation of water supply pipe to water trough or pasture pump | £3 per metre of pipe laid Water trough pump: cattle operated pasture or nose pump | £180 per installed pump Stock bridge for bog management: Small bridge Large bridge (for ditch wider than 1.5 metres) £170 per bridge £620 per bridge Heather management (in black grouse and Capercaillie core areas) | £250/hectare Manual eradication of rhododendron: Light infestation/easy access Medium infestation/access Difficult access £4,500 per hectare of infested land £6,100 per hectare of infested land £9,500 per hectare of infested land Mechanised eradication of rhododendron: Light infestation/easy access Medium infestation/access Difficult access £1,800 per hectare of infested land £2,400 per hectare of infested land £2,900 per hectare of infested land Chemical eradication of rhododendron by foliar or stem injection | £1,500 per hectare of infested land Self-closing/kissing gate for non-vehicular access | £350 each Stile | £55 each Building/restoring drystane or flagstone dykes | £17.50 per square metre…

  1. 12 Jun 2015 – todayin force
  2. 15 Mar 2011 – 12 Jun 2015earlier wording
  3. 14 Feb 2011 – 15 Mar 2011earlier wording