The Electricity (Applications for Consent) Regulations 1990 shall be amended as follows.
In regulation 3(1) (interpretation) after “these Regulations-” insert–
“EIA development” has the same meaning as set out in regulation 2(1) of the Electricity Works (Environmental Impact Assessment) (Scotland) Regulations 2000;
.
In regulation 11(1) (fee payable on applications for consent) for the Table substitute–
TABLE
Subject matter of application for consent | Fee
Overhead line with a total distance not exceeding 15 km which is not an EIA development
| £150.00
Overhead line with a total distance not exceeding 15 km which is an EIA development
| £2,000.00
Overhead line with a total distance–
exceeding 15 km but not exceeding 50 km
| £15,000.00
exceeding 50 km but not exceeding 100 km
| £25,000.00
exceeding 100 km
| £50,000.00
Construction or construction and operation of a generating station of megawatt capacity–
not exceeding 100
| £15,000.00
exceeding 100 but not exceeding 200
| £20,000.00
exceeding 200 but not exceeding 500
| £30,000.00
exceeding 500
| £50,000.00
Extension or extension and operation of a generating station resulting in increase in megawatt capacity–
not exceeding 100
| £15,000.00
exceeding 100 but not exceeding 200
| £20,000.00
exceeding 200 but not exceeding 500
| £30,000.00
exceeding 500
| £50,000.00
Extension of a nuclear generating station by retrofitting of emission control equipment
| £5,000.00
Any other extension of a generating station
| £1,000.00
Operation only or change to manner of operation of a generating station
| £1,000.00
.
In regulation 11(2) for “heads 3 to 7” substitute “heads 5 to 8”.