The Electricity (Applications for Consent) Amendment (Scotland) Regulations 2005, 2

Amendment of Regulations

In forcecited 1×
(1)

The Electricity (Applications for Consent) Regulations 1990 shall be amended as follows.

(2)

In regulation 3(1) (interpretation) after “these Regulations-” insert–

“EIA development” has the same meaning as set out in regulation 2(1) of the Electricity Works (Environmental Impact Assessment) (Scotland) Regulations 2000;

.

(3)

In regulation 11(1) (fee payable on applications for consent) for the Table substitute–

TABLE

Subject matter of application for consent | Fee

1.

Overhead line with a total distance not exceeding 15 km which is not an EIA development

| £150.00

2.

Overhead line with a total distance not exceeding 15 km which is an EIA development

| £2,000.00

3.

Overhead line with a total distance–

(a)

exceeding 15 km but not exceeding 50 km

| £15,000.00

(b)

exceeding 50 km but not exceeding 100 km

| £25,000.00

(c)

exceeding 100 km

| £50,000.00

4.

Construction or construction and operation of a generating station of megawatt capacity–

(a)

not exceeding 100

| £15,000.00

(b)

exceeding 100 but not exceeding 200

| £20,000.00

(c)

exceeding 200 but not exceeding 500

| £30,000.00

(d)

exceeding 500

| £50,000.00

5.

Extension or extension and operation of a generating station resulting in increase in megawatt capacity–

(a)

not exceeding 100

| £15,000.00

(b)

exceeding 100 but not exceeding 200

| £20,000.00

(c)

exceeding 200 but not exceeding 500

| £30,000.00

(d)

exceeding 500

| £50,000.00

6.

Extension of a nuclear generating station by retrofitting of emission control equipment

| £5,000.00

7.

Any other extension of a generating station

| £1,000.00

8.

Operation only or change to manner of operation of a generating station

| £1,000.00

.

(4)