…
The Waste Incineration (Scotland) Regulations 2003 (revoked), 12
Changed on 7 Jan 2013
In Part 1 of Schedule 4 (application for permits)–
(a) in paragraph 1(1)(d), after “Part A mobile plant”, there is inserted “(except for an installation or mobile plant falling within paragraph (d) and (e) of Part A of Section 5.1 of Part 1 of Schedule 1)”;
(b) after paragraph 1A insert–
1B (1) Subject to paragraph (2), an application for a permit to operate a waste incineration installation shall in addition contain a description of the measures which are envisaged to guarantee in respect of that installation that–
(a) the plant is designed, equipped and will be operated in such a manner that the requirements of Directive 2000/76/EC of the European Parliament and of the Council of 4th December 2000 on the incineration of waste are met, taking into account the categories of waste to be incinerated;
(b) the heat generated during the incineration and co-incineration process is recovered as far as practicable, for example, through combined heat and power, the generating of process steam or district heating;
(c) the residues will be minimised in their amount and harmfulness and recycled where appropriate;
(d) the disposal of the residues which cannot be prevented, reduced or recycled will be carried out in conformity with national and EU legislation ; and
(e) the proposed measurement techniques for emissions into the air comply with Annex III of Directive 2000/76/EC of the European Parliament and of the Council of 4th December 2000 on the incineration of waste and, as regards water, comply with paragraphs 1 and 2 of that Annex.
(2) Sub-paragraph (1) shall not apply to an existing waste incineration installation in respect of which an application for a permit is duly made before 28th December 2004.
.…
- 7 Jan 2013 – todayin force
- 22 Apr 2011 – 7 Jan 2013earlier wording
- 1 Apr 2003 – 22 Apr 2011earlier wording
- 10 Mar 2003 – 1 Apr 2003earlier wording