The Scottish Secure Tenants (Right to Repair) Regulations 2002, 10

Maximum period

In forcecited 1×
(1)

The maximum period within which a qualifying repair is to be completed is the number of working days specified in column 2 of the Schedule opposite the defect specified in column 1 of the Schedule.

(2)

The maximum period shall start on the first working day after–

(a)

the date of receipt of notification of the qualifying repair by the landlord; or

(b)

where the landlord inspects the house under regulation 8(a), the date of inspection.