The Construction (Design and Management) Regulations (Northern Ireland) 2016
Typestatutory instrumentDate11 Mar 2016Articles84Versions held3Cited by12 documentsLast changed1 Jan 2018
- 8General duties
- 9Duties of designers
- 10Designs prepared or modified outside Northern Ireland
- 11Duties of a principal designer in relation to health and safety at the pre-construction phase
- 12Construction phase plan and health and safety file
- 13Duties of a principal contractor in relation to health and safety at the construction phase
- 14Principal contractor's duties to consult and engage with workers
- 15Duties of contractors
- 16Application of Part 4
- 17Safe places of construction work
- 18Good order and site security
- 19Stability of structures
- 20Demolition or dismantling
- 21Excavations
- 22Cofferdams and caissons
- 23Reports of inspections
- 24Energy distribution installations
- 25Prevention of drowning
- 26Traffic routes
- 27Vehicles
- 28Prevention of risk from fire, flooding or asphyxiation
- 29Emergency procedures
- 30Emergency routes and exits
- 31Fire detection and fire-fighting
- 32Fresh air
- 33Temperature and weather protection
- 34Lighting
Source: legislation.gov.uk (The National Archives), UK legislation with its point-in-time versions. Official publication. Reuse: Open Government Licence v3.0.