Commission Regulation (EU) 2017/459 of 16 March 2017 establishing a network code on capa…, 4

Coordination of maintenance

In forcesince 31 Dec 2020

Where maintenance of a pipeline or part of a transmission network has an impact on the amount of transmission capacity which can be offered at interconnection points, the transmission system operator(s) shall fully cooperate with their adjacent TSOs regarding their respective maintenance plans in order to minimise the impact on potential gas flows and capacity at an interconnection point. Where an adjacent TSO is a non-UK TSO, the transmission system operator must endeavour to fully cooperate with the non-UK TSO regarding their respective maintenance plans.

Changed on 31 Dec 2020

Where maintenance of a pipeline or part of a transmission network has an impact on the amount of transmission capacity which can be offered at interconnection points, the transmission system operator(s) shall fully cooperate with their adjacent transmission system operator(s) TSOs regarding their respective maintenance plans in order to minimise the impact on potential gas flows and capacity at an interconnection point. Where an adjacent TSO is a non-UK TSO, the transmission system operator must endeavour to fully cooperate with the non-UK TSO regarding their respective maintenance plans.

  1. 31 Dec 2020 – todayin force
  2. 16 Mar 2017 – 31 Dec 2020earlier wording