Recital 5, Commission Regulation (EU) No 601/2012 of 21 June 2012 on the monitoring and reporting o…

In forcesince 21 Jun 2012

The monitoring plan, setting out detailed, complete and transparent documentation concerning the methodology of a specific installation or aircraft operator should be a core element of the system established by this Regulation. Regular updates of the plan should be required, both to respond to the verifier’s findings and on the basis of the operator’s or aircraft operator’s own initiative. The main responsibility for the implementation of the monitoring methodology, parts of which are specified by procedures required by this Regulation, should remain with the operator or the aircraft operator.