Commission Implementing Regulation (EU) No 433/2012of 23 May 2012laying down detailed ru…, 12

Prior notification of entry into port

In forcesince 1 Jul 2015

The prior notification referred to in Article 24 of Regulation (EU) No 1236/2010 shall be made by means of the Port State Control (PSC) form provided for in Annex VIII with Part A duly completed as follows:

the form PSC 1 shall be used where the vessel is carrying its own catches;

the form PSC 2 shall be used where the vessel is engaged in transhipment operations, providing the information separately for catches from each donor vessel.

  • celex=32010R1236