Part 1
Construction and maintenance
Sheet of Parliamentary plans | Road | Structure not to vest in roads authority
| (2) | (3)
3 | Work No. 4 | The bridge over the railway
4 | Crowwood Drive Overbridge, Clarkston, Works Nos. 2A, 6 and 7, so much of Station Road, Airdrie as is in plot no. 65 in North Lanarkshire and the footpaths between points A and B and C and D |
4, 5, 6 | Work No. 2B |
6 | Work No. 9A |
6, 7 | Work No. 9 |
7 | Works Nos. 2C, 11, 12 and 13 |
7, 8 | Work No. 10 |
8, 9, 10 | Work No. 2E |
10 | Work No. 16 and the footbridge between Main Street, Caldercruix and Station Road, Caldercruix |
11 | Works Nos. 18 and 19 |
12, 13, 14, 15, 16, 17, 18, 19, 20, 21 | Work No. 2F | The bridge over the railway at Bedlormie Mains Farm
16 | Work No. 21 |
17 | Works Nos. 22B and 23 |
19 | Work No. 25B |
22 | Works Nos. 2G and 27 and the footpath between points C1and D1 |
22, 24 | Work No. 2J and the footpath between points E and F |
24 | Work No. 31 | The bridge under the railway
24 | Work No. 30B | The bridge over the railway and so much of Millbank Quarry road as is in plots nos. 511, 513 and 515
24, 25 | Work No. 2K |
27, 29, 30 | Work No. 2L |
28, 29 | Work No. 31A |
30, 31 | So much of the footpath between points G and H as is between Standhill Farm and Stonerigg Road, Armadale |
31, 32, 33 | Work No. 2N |
32, 33 | Work No. 33, so much of Work No. 34 as is in plots nos. 629, 633 and 652 in West Lothian and so much of the footpath between points J and K as is between Station Road, Armadale (B8084) and point J |
33 | Work No. 37 |
33, 34, 35, 38 | Work No. 2P |
38 | Work No. 2Q |
38, 39 | Work No. 2R |
40 | Work No. 39B |
40, 41 | Work No. 2S and the footpath between points L and M |
41 | Work No. 40 | The bridge under the railway
41 | Works Nos. 41 and 42 |
44 | Work No. 44 |
47 | Work No. 47B | The bridge over the railway
52 | Work No. 51 and so much of Work No. 52 as is in plots nos. 991, 992 and 993 in West Lothian | So much of the bridge structure as is designated by Network Rail
57 | The footpath between points S and T |
59 | Work No. 55B | The bridge over the railway
60 | Work No. 56B | The bridge over the railway
Part 2
Vesting in roads authority
Authorised work | Time of vesting
| (2)
Each road specified in subsection (1) | The expiry of the period during which the authorised undertaker is liable to maintain any road under subsection (2)
The car park and access provided in plots nos. 365A, 365B and 365C in North Lanarkshire | Completion of construction
The bus lay-by and car park provided in plots nos. 367, 367A and 367B in North Lanarkshire | Completion of construction
The car park provided in plot no. 990 in West Lothian | Completion of construction
The cyclepath provided in plots nos. 457 and 458 in West Lothian | Completion of construction
The cyclepath provided in plots nos. 462 and 462B in West Lothian | Completion of construction
The cyclepath provided in plots nos. 549, 550, 551 and 552A in West Lothian | Completion of construction
Part 3
Vesting of private accesses
Sheet of Parliamentary plans | Private access | Structure not to vest as private access
| (2) | (3)
5 | Work No. 8B (Katherine Park Lane) | The bridge over the railway
13 | Work No. 20B | The bridge over the railway
19 | Work No. 24 | The bridge over the railway
21 | Work No. 26 | The bridge over the railway
24 | Work No. 30B | The bridge over the railway and so much of Millbank Quarry Road and Station Road as is in plots nos. 519 and 522
30, 31 | Work No. 32 |
33 | Works Nos. 35 and 36 |
38 | Access track in plot no. 700A in West Lothian |
41 | Work No. 43 |
44, 45 | Work No. 46 |
58 | Work No. 54B | The bridge over the railway
60 | Work No. 57B | The bridge over the railway