RHA 2016, s. 27

Further key matters of standard contracts

In forcesince 18 Jan 2016

The following are key matters in relation to standard contracts (in addition to those set out in section 26)—

(a)

whether the contract is periodic or made for a fixed term,

(b)

if it is made for a fixed term, the term for which it is made, and

(c)

if there are periods during which the contract-holder is not entitled to occupy the dwelling as a home, those periods (see sections 121 and 133).