Recital 40, Regulation (EU) 2026/253

In forcesince 6 Feb 2026

Point 4.2.3.3.2 of the Annex to Implementing Regulation (EU) 2019/773 (‘OPE TSI’) requires the railway undertaking to inform the infrastructure manager when a train is ready for access to the network. Currently, that requirement is implemented in different ways depending on infrastructure characteristics (for example, Railway Mobile Radio (RMR) systems, ETCS L2, dedicated interlocking at departure point, dedicated telematics message). Point 4.2.4 of Annex I to Implementing Regulation (EU) 2023/1695 (‘CCS TSI’) sets out requirements for mobile communication functions for railways (RMR), which for GSM-R Voice and operational communication applications mandate the application of system requirements specification referenced in index [33] of Appendix A to that Annex. Those requirements specify the dialling code to be used for ‘train ready’ and ‘train not ready’ respectively. Point 4.2.2 of Annex I to Implementing Regulation (EU) 2023/1695 (‘CCS TSI’) sets out requirements for on-board ETCS functionalities, which for the ‘Start of mission’ procedure in ETCS L2 are defined in the system requirements specification referenced as index [4] referred to in the Appendix A to that Annex. For the purposes of this Regulation, those options for communicating on train readiness should be limited and harmonised.