The following table sets out the requirements and testing procedures for the subsystem telematics that are open points in accordance with Article 4(6) of Directive (EU) 2016/797. The testing procedures to be applied to assess compliance with those requirements are also open points.
Telematics TSI point | Open point
Requirements
1.1 | Additional levels of integrity and dependability for data to be used for the safety of operations
1.7.1 | Web user interfaces for capacity management, train preparation, and traffic management
1.7.2 | Web user interfaces for the management of freight wagons and their load
2.1.7(3) | Identification of shunting movements
2.2 | Strategic management of infrastructure capacity
2.3.1(4) | Planning of shunting movements and stabling
2.3.1(5) | Coordination of multi-network processes in the area of capacity management
2.3.1(8) | Time threshold for ad hoc request for the allocation of infrastructure capacity
2.3.9 | Capacity allocation coordination process
2.4.1 | Coordination of capacity restrictions
2.4.2 | Consultation of stakeholders affected by planned capacity restrictions
2.4.3 | Publication of capacity restrictions
2.6.7(2) | Path section modification
3.1.2 | Reservation, payment and invoicing systems for freight rail transport services
3.2.1.1(4) | Geolocalisation-based positioning of freight wagons
3.2.1.3(5) | Load ready for movement
3.2.2 | Movement of intermodal loading units
4.2.2.4 | Calculation of connection times and additional times for check-in
4.3.2(2) | Management of rail ticketing and ticket check rules
4.5.1(7) | Combination of rail products by the distributor or the retailer, and communications between them
4.5.1(8) | APIs used to distribute and sell a rail product, except to check its availability or reserve it
4.6.4.2(2) | Reimbursement or compensation requests
Testing procedures
Appendix D.3.B(1) | Testing procedures for tariff data
Appendix D.3.C(1) | Testing procedures for availability check and reservation