Recital 5, Decision_act (EU) 2026/2059

In forcesince 17 Sep 2026

As an alternative provision, Poland proposes to apply point 7.4.2.1.2(3)(a) of the Annex to Commission Regulation (EU) 2016/919 [Commission Regulation (EU) 2016/919 of 27 May 2016 on the technical specification for interoperability relating to the ‘control-command and signalling’ subsystems of the rail system in the European Union (OJ L 158, 15.6.2016, p. 1, ELI: http://data.europa.eu/eli/reg/2016/919/oj).], as last in force on 27 September 2023. In accordance with that provision, the requirement to be equipped with ETCS is not to apply to new vehicles that do not circulate on specified types of lines. Vehicles circulating only on line No 65 do not require the installation of ETCS, since line No 65 is not a high-speed line, not a line on the corridors defined in Annex I to Commission Implementing Regulation (EU) 2017/6 [Commission Implementing Regulation (EU) 2017/6 of 5 January 2017 on the European Rail Traffic Management System European deployment plan (OJ L 3, 6.1.2017, p. 6, ELI: http://data.europa.eu/eli/reg_impl/2017/6/oj).], or a line ensuring the connections to the main European ports, marshalling yards, freight terminals and freight transport areas defined in Article 2(1) of Implementing Regulation (EU) 2017/6.