38 COMMISSION ASSESSMENT › Assessment of the cost-efficiency targets, Decision_act (EU) 2026/1042

In forcesince 23 Apr 2026

The PRB has calculated the estimated differences between the determined costs for RP4 set by Ireland in the revised draft performance plan and the determined costs that would be required to meet the Union-wide DUC trend for RP4 and the long-term Union-wide DUC trend for RP3 and RP4 combined. Based on the PRB findings, the total determined costs for RP4 proposed by Ireland fall short by approximately EUR 92,9 M in EUR2022 of the level required to meet the Union-wide DUC trend, which represents an average annual gap of EUR 18,6 M in EUR2022. A similar difference amounting over the whole RP4 to approximately EUR 98,0 M in EUR2022 is observed against the level required to meet the long-term Union-wide DUC trend, which corresponds to an annual average gap of EUR 19,6 M in EUR2022.