The conclusion of the technical examination by the Working Group was that the operation, bunkering and maintenance of the system can be safely undertaken having regard to the planned measures and procedures set out in the technical documentation. It is, therefore, possible to state that an adequate level of safety referred to in Article 25(1), point (b), of Directive (EU) 2016/1629 is ensured, provided that the conditions set out in the Annex are met. Therefore, the proposed derogation can be granted.
Recital 9, Decision_act (EU) 2026/712
In forcesince 24 Mar 2026