8 2. UNDERTAKING › 2.1. Undertaking offer, Decision_act (EU) 2026/328

In forcesince 9 Feb 2026

Since the product covered has not been produced during the investigation period of the original investigation that run from 1 October 2023 to 30 September 2024, the MIPs for the different types of the product covered were established on the basis of a non-subsidised price. They were constructed using cost of production data for a comparable BEV manufactured by the Volkswagen Group in the Union, and a reasonable profit margin. The MIPs have been adjusted for physical differences in respect of their exterior and interior design features and certain equipment, where appropriate.