Recital 8, Regulation (EU) 2025/2273

In forcesince 30 Jun 2025

For the purpose of this Regulation, the emission performance refers both to the operational emissions produced on-site (direct) and those from off-site generation of energy used by the building (indirect). When calculating the cost-optimal levels of minimum energy performance requirements, Member States could also take into account the life-cycle global warming potential (GWP).