Recital 11, Decision_act (EU) 2025/1332

In forcesince 9 Jul 2025

In order for the line to be operational as early as possible, Estonia, Latvia and Lithuania should build the Rail Baltica line as a single track from Tallinn to Kaunas during the first phase. To start ramping up cross-border traffic on the Rail Baltica corridor during the first phase, Lithuania should be able to implement energy, control-command and signalling subsystem installations on the existing railway track in in the European standard nominal gauge of 1435 mm on the section between Poland and Kaunas.